FIELD: construction.
SUBSTANCE: installation method of screed intermediate metal strips includes tension of cord branches in the horizontal direction in the vertical plane between the previously installed vertical angular strips, installation of intermediate strips between the wall surface and the strained horizontal cord branches with subsequent attachment of the intermediate strips to the wall surface and further installation of wedges between the wall surface and the intermediate strips, besides the ends of the cord are attached directly to angular strips, and the cord branches between the angular strips form a serpentine line with intermediate fastening of branches in places of bending on the surface of the angular strips; the intermediate strips are attached to the wall along the entire length by fasteners in a staggered order in crossing points in the space of the intermediate strips with the horizontal cord branches with the subsequent installation of the wedges between the wall surface and the intermediate strips, facing by their work surfaces to the fasteners.
EFFECT: increase of the installation quality due to fast installation of the screed strips.
9 dwg
Title | Year | Author | Number |
---|---|---|---|
RULE | 2015 |
|
RU2600226C1 |
METHOD TO INSTALL METAL SCREED STRIP AND ACCESSORY FOR ITS FIXATION ON SPECIFIED LEVEL RELATIVE TO SURFACE (WALL, CEILING, FLOOR) | 2012 |
|
RU2540730C2 |
DEVICE FOR RESTORING THE WORKING SURFACE OF THE PLASTERING RULES | 2017 |
|
RU2667261C1 |
METHOD FOR STRING SCREED MAKING OF MORTAR | 2005 |
|
RU2291262C1 |
STRAIGHTENER | 2016 |
|
RU2625134C1 |
STRAIGHTENER | 2009 |
|
RU2415236C1 |
PLASTERING-TROWELING TOOL AND METHOD OF ITS PREPARATION FOR OPERATION | 2019 |
|
RU2723332C1 |
DEVICES, METHODS FOR THEIR FASTENING AND LEVELLING OF SURFACES | 2014 |
|
RU2603647C2 |
GUIDE STRING | 2006 |
|
RU2308579C1 |
PROCESS OF REINFORCEMENT OF STONE STRUCTURES OF BUILDING | 2000 |
|
RU2196868C2 |
Authors
Dates
2014-06-27—Published
2013-03-12—Filed