FIELD: mining.
SUBSTANCE: proposed method comprises erection of framework and filling it with solid stowing material. Note here that said framework in chamber mined-out space is made of used tires. Said tires are laid in piles from soil to course roof, interconnected and filled with rock. Then, sealing coat is laid on framework over contact with roof to feed solid solution via hole in said coat. After cementation of said solution, said chamber is isolated from adjacent courses by webs and filled with hydraulic fill.
EFFECT: higher efficiency, lower costs owing to the use of used large truck tires.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DISPOSAL OF TOXIC AND RADIOACTIVE WASTES IN MINES | 2013 |
|
RU2532951C1 |
METHOD OF ERECTING SUPPORTING PILLAR | 0 |
|
SU1745940A1 |
METHOD OF MINED-OUT SPACE FILLING | 2015 |
|
RU2603992C1 |
METHOD OF DISPOSAL OF TOXIC AND RADIOACTIVE WASTES | 2014 |
|
RU2576331C1 |
METHOD OF ERECTION OF ARTIFICIAL PILLAR | 1999 |
|
RU2160366C1 |
METHOD OF MINING THICK FLAT DEPOSITS | 0 |
|
SU1758224A1 |
METHOD OF PROTECTION OF WORKINGS IN WORKED-OUT AREA | 2008 |
|
RU2376472C1 |
METHOD AND DEVICE FOR PLACING FILLING-UP MATERIALS IN UNDERGROUND WORKINGS AT SHIELD SYSTEM OF MINING | 0 |
|
SU1763678A1 |
MINING METHOD OF THIN FLAT ORE BODY | 2010 |
|
RU2456452C2 |
METHOD FOR MINING OF MINERAL GENTLY SLOPING BEDS | 1990 |
|
RU2017961C1 |
Authors
Dates
2014-06-27—Published
2013-03-12—Filed