FIELD: mining.
SUBSTANCE: method comprises the arrangement of chambers divided by interchamber pillars, building of kistns from the used tyres of heavy machinery, placement in kistns of containers with wastes and filling of chambers with a hydraulic backfilling from hardening mixes.
EFFECT: use of disposed tyres of heavy machinery for improvement of reliability of disposal of hazardous industrial wastes.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DISPOSAL OF TOXIC AND RADIOACTIVE WASTES | 2014 |
|
RU2576331C1 |
ERECTION OF ARTIFICIAL SUPPORTS IN OPEN AREAS | 2013 |
|
RU2521269C1 |
METHOD FOR BURYING TOXIC WASTE IN MINE WORKINGS | 1996 |
|
RU2118459C1 |
METHOD OF UNDERGROUND MONITORED CONFINEMENT OF RADIOACTIVE WASTE IN SOLIDIFYING FILLING OF WORKED-OUT SPACE OF ORE BODY | 1990 |
|
SU1782135A1 |
METHOD OF UNDERGROUND MINING OF ORE BODY WITH SELF-CEMENTING FILL OF GOAF | 0 |
|
SU1709093A1 |
METHOD FOR CREATING UNDERGROUND REPOSITORIES OF TOXIC WASTES IN SALT-BEARING ROCKS | 1993 |
|
RU2066770C1 |
METHOD FOR STRENGTHENING OF HYDRAULIC STOWAGE MASSIF SURFACES | 2008 |
|
RU2395691C2 |
METHOD FOR EXTRACTING SALT DEPOSITS | 2003 |
|
RU2235879C1 |
METHOD OF UNDERGROUND STORAGE OF INDUSTRIAL WASTES IN SALT ROCKS | 1990 |
|
SU1773019A1 |
METHOD FOR OPEN-UNDERGROUND DEVELOPMENT OF FLAT-LYING FORMATIONS | 2019 |
|
RU2715503C1 |
Authors
Dates
2014-11-20—Published
2013-07-29—Filed