METHOD FOR MOUNTING PORTAL CRANE AND PORTAL CRANE MOUNTED ACCORDING TO SAID METHOD Russian patent published in 2014 - IPC B66C5/00 B66C19/00 

Abstract RU 2521480 C1

FIELD: transport.

SUBSTANCE: when portal crane is mounted pre-assembled span is lifted by means of strand jacks mounted on erection gantry, support pillars are attached to span beam, and assembled structure is installed on rail balance trucks with consequent fixation of support pillars. Lifting of span by means of strand jacks is performed into intermediate position, whereupon balance trucks connected in pairs by end beams are installed on rails under span. On the latter vertical guides are installed in which part of sections are placed of which sections support pillars are made. Span is lowered by strand jacks onto support pillar section ends protruding from guides. After this, mounting gantries are dismantled and step-by-step lifting of span is performed until design height is achieved. Portal crane includes span with at least one hoist trolley installed on it, balance trucks installed in pairs under ends of span and connected by end beams, and support pillars rigidly attached by one their ends to span beam. In the middle part on end beams, vertical guides are mounted having slewing pads for support pillars formed of vertical sections rigidly interconnected by detachable connections. To the span, upper sections of support pillars are attached, and in guides their lower sections are installed which are attached to slewing pads or guides.

EFFECT: reducing labour consumption, complexity and time spent for erection and dismantling of portal crane.

9 cl, 6 dwg

Similar patents RU2521480C1

Title Year Author Number
GANTRY CRANE MOUNTING METHOD AND GANTRY CRANE MOUNTED ACCORDING TO THIS METHOD 2013
  • Zertsalov Andrej Ivanovich
  • Kul'Bachnyj Stanislav Orestovich
RU2521881C1
SELF-ERECTING GANTRY CRANE 0
  • Eremin Anatolij Nikolaevich
  • Krylov Nikolaj Yakovlevich
  • Karpov Aleksandr Ivanovich
  • Ermolaev Oleg Filippovich
SU1794870A1
CRANE FOR MOUNTING RAILWAY BRIDGE FRAMEWORK 2002
  • Kogat'Ko G.I.
  • Kornishin E.V.
  • Khimchenko V.P.
  • Poplavskij V.G.
  • Korjakin Ju.Ja.
  • Zavodin A.V.
  • Fomenko S.G.
RU2225829C2
METHOD AND ARRANGEMENT FOR SWITCHING A GANTRY CRANE TO A PARALLEL TRACK 0
  • Pugach Anatolij Aleksandrovich
  • Lebedev Yurij Anatolevich
  • Zakharenko Vladimir Ivanovich
SU691382A1
MOBILE GANTRY CRANE 2018
  • Ilchenko Evgenij Konstantinovich
  • Kozlov Viktor Evgenevich
RU2706773C1
GANTRY CRANE 2000
  • Lysenko O.N.
  • Molodtsov Ju.V.
  • Urakov V.F.
RU2179145C1
TRAVELLING GANTRY CRANE 0
  • Shchevelev Yurij Sergeevich
  • Saplin Viktor Stepanovich
  • Vojtenko Lyubov Grigorevna
SU1723009A1
UNIVERSAL COLLAPSIBLE MOBILE GANTRY CRANE AT CRANE TRESTLE 2012
  • Mel'Nikov Evgenij Grigor'Evich
RU2503611C2
SLUICE-LOCK CRANE FOR MOUNTING GIRDER SPAN STRUCTURES OF RAILWAY BRIDGES 0
  • Taskaev Albert Konstantinovich
  • Epshtejn Vladimir Maksovich
SU977367A1
0
  • Inostranets Fatschinetti Per Dzhiovanni
  • Inostranna Firma Anderstoun Klajd Indzhini Ere Limited
SU241329A1

RU 2 521 480 C1

Authors

Nikishin Andrej Ivanovich

Kul'Bachnyj Stanislav Orestovich

Kolinichenko Aleksandr Alekseevich

Osipova Marina Gennadievna

Dates

2014-06-27Published

2013-03-20Filed