FIELD: oil-and-gas industry.
SUBSTANCE: proposed method consists in application of wave dilation technology. Note here that operation of pumping units in wells is synchronised, said units being equipped with wave dilation effects promoters. To ensure said synchronisation, downhole hardware is furnished with sensors for registration of elastic vibrations and channels for transmission of received signal to the surface at pumping unit operation control board. Note also that synchronisation of every pumping unit in the field is effected in frequency of signal generated pumping unit of master well.
EFFECT: higher efficiency of extraction and oil yield.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF HYDROCARBONE FIELD DEVELOPMENT | 2009 |
|
RU2377398C1 |
PHYSICAL EFFECT METHOD USED DURING DEVELOPMENT OF HYDROCARBON DEPOSIT, AND BORE-HOLE PLANT FOR METHOD'S REALISATION | 2007 |
|
RU2366806C1 |
METHOD OF PRODUCTION WELLS RECOVERY RATE INCREASE AT LATE STAGES OF OIL FIELD PRODUCTION | 2008 |
|
RU2380529C2 |
OIL DEPOSIT DEVELOPMENT METHOD | 2010 |
|
RU2406817C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2010 |
|
RU2406816C1 |
BOREHOLE FLUID OSCILLATION EXCITATION METHOD | 2004 |
|
RU2266395C1 |
WELL OPERATION METHOD | 2004 |
|
RU2261984C1 |
DEVICE FOR OIL PRODUCTION AND WELL BOTTOM ZONE TREATMENT | 2006 |
|
RU2307925C1 |
METHOD FOR FLUID OSCILLATION EXCITING IN WELL BOTTOM ZONE | 2006 |
|
RU2307230C1 |
WELL LIQUID OSCILLATION EXCITING METHOD | 2003 |
|
RU2266402C2 |
Authors
Dates
2014-08-20—Published
2013-07-02—Filed