FIELD: construction.
SUBSTANCE: formwork block for manufacturing of multi-layer solid structures comprises embedded boards and links, transverse reinforcement, and also formwork shields, with edges made as capable of joining with other formwork shields, in which the specified shields are placed in the space between the specified shields and are connected with them (shields) by means of specified links as capable of non-breaking separation of specified shields from the specified links after pouring of fluid material into the specified space and its (material) hardening.
EFFECT: increased strength of a structure.
15 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF SANDWICH WALL FORMATION | 2006 |
|
RU2335604C2 |
RETAINED FORM ASSEMBLY, METHOD OF ASSEMBLY PRODUCTION AND METHOD OF WALL ERECTION WITH THE USE OF ABOVE ASSEMBLY | 2004 |
|
RU2253719C1 |
RETAINED FORM BLOCK | 2005 |
|
RU2305158C2 |
FIXED FORMWORK UNIT | 2023 |
|
RU2824115C1 |
METHOD OF ERECTING HEAT-INSULATING WALLS OF BUILDING USING RETAINED FORMWORK | 2015 |
|
RU2608374C1 |
METHOD TO ERECT EXTERNAL BUILDING WALLS | 2013 |
|
RU2528758C1 |
RETAINED FORMWORK PACKAGE, METHOD OF ITS ASSEMBLY AND METHOD OF CONSTRUCTION OF MONOLITHIC WALLS OF BUILDING AND STRUCTURE IN RETAINED FORMWORK OF MODULAR ELEMENTS | 2013 |
|
RU2561135C2 |
STATIONARY FALSEWORK, METHOD FOR ASSEMBLING THE LATTER AND METHOD FOR CONSTRUCTION OF MONOLITHIC WALLS AND STRUCTURES IN STATIONARY FALSEWORK | 2003 |
|
RU2248433C1 |
SOLID CONCRETE BUILDING | 2008 |
|
RU2380493C1 |
METHOD FOR CONSTRUCTION OF CAST-IN-PLACE BUILDING WALLS | 2020 |
|
RU2737387C1 |
Authors
Dates
2014-09-10—Published
2013-05-23—Filed