FIELD: transport.
SUBSTANCE: this method comprises location on one board of the main freight carrier with superstructure and crew of first extra freight carrier with superstructure without crew for accommodation of freight. Second extra freight carrier is arranged on opposite board to be connected by common hollow stiffness pipes. Sealed streamlined cylindrical air vessels are fixed from the bottom of said hollow stiffness pipes to activate the ship load. Said vessels are positioned between main and extra freight vessels while extra freight vessels are located on opposite board over the entire length of freight vessels superstructures. Freight carrier surface deck is composed of the platform bottom and top parts. One or several rows of lifters are arranged in a row or several rows to lift the platform upper part. First and second submarines with propellers are fixed under hollow stiffness pipes under first and second extra freight vessels. Blades of said propellers represent two engaged auger-like screws.
EFFECT: enhanced performances.
2 dwg
Authors
Dates
2014-09-27—Published
2013-09-03—Filed