FIELD: oil-and-gas industry.
SUBSTANCE: at wellhead the string is equipped at bottom with blind filter, above the filter the mechanical packer is installed, above it a drain valve is installed, string is lowered in the well such that packer will be above the formation, and filter will be below the formation perforation interval. Backflow washing is performed by surface-active substance solution under accelerated mode, the packer is installed. The string head is installed at wellhead, chokes with valves are installed on it. The choke bores increase in upward direction. The hydraulic swabbing in performed by cycles depending on number of chokes with the solvent periodic injection to the formation via the string with gradual injection overpressure increasing during each cycle, excluding the hydraulic fracturing of the formation, and leak of the formation injected solvent via the string through the choke to tank in wellhead zone of the well. Upon the hydraulic swabbing completion the drain valve is destructed and above packer space is connected with the string via the drain valve hole, the liquid is swabbed from the tubing-casing annulus of the well through the string. Packer is released and removed with string from the well.
EFFECT: improved cleaning efficiency and possibility to monitor the process, hydraulic impact is excluded.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR INHIBITION OF A WELL WITH A SUCKER ROD PUMPING UNIT IN CONDITIONS COMPLICATED BY SCALE DEPOSITION IN DOWNHOLE PUMPING EQUIPMENT | 2022 |
|
RU2786893C1 |
METHOD FOR CLEANING THE BOTTOMHOLE FORMATION ZONE OF AN INJECTION WELL AND A DEVICE FOR ITS IMPLEMENTATION | 2022 |
|
RU2789899C1 |
METHOD OF SIMULTANEOUS AND SEPARATE OPERATION OF INJECTION WELL | 2012 |
|
RU2488687C1 |
METHOD OF CLEANING BOTTOMHOLE ZONE OF FORMATION OF INJECTION WELL | 2015 |
|
RU2604891C1 |
METHOD FOR CLEANING NEAR WELLBORE REGION OF INJECTION WELLS | 2007 |
|
RU2332557C1 |
CLEANING METHOD FOR BOTTOMHOLE FORMATION ZONE OF INJECTION WELL | 2006 |
|
RU2306405C1 |
INJECTION WELL HEAD TUBING | 2005 |
|
RU2300623C1 |
METHOD FOR CLEANING THE BOTTOMHOLE FORMATION ZONE OF A WELL | 2021 |
|
RU2775368C1 |
SYSTEM TO PUMP WATER AND CLEAN BOTTOMHOLE FORMATION ZONE OF INJECTION WELL | 2010 |
|
RU2450120C1 |
METHOD FOR CLEANING FACE-ADJACENT ZONE OF BED OF FORCE WELL WITH WASHING OF TRANSFER WATER DUCT | 2005 |
|
RU2293175C1 |
Authors
Dates
2015-01-10—Published
2013-10-18—Filed