FIELD: oil and gas industry.
SUBSTANCE: method involves separation of formations in a well with a packer, pumping of liquid to each formation via its pipe string, interruption of pumping to both formations, continuation of pumping to the formation with high permeability and continuation of pumping to both formations. Strings at the well head are connected with a disengaged connection strap. First, maximum allowable requirements for pressure and intake capacity for low-permeability formation are determined. Interruption of pumping is performed after reduction of intake capacity and rise of pressure at the head of the pipe string interconnected with the formation with low intake capacity to maximum allowable requirements. Pumping to the formation with high intake capacity is performed owing to liquid flowing from the formation with low intake capacity via pipe strings through the connection strap till the wellhead pressure is equalised; after that, liquid residues are removed from the formation with low intake capacity to a movable tank in the near-wellhead zone.
EFFECT: possibility of restoring the intake capacity of the formation with low intake capacity without underground repair and overhaul of the well; excluding contamination of the water passage led to an injection well from a cluster pumping house with the contaminants escaping the bottom-hole zone of the formation.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CLEANING FACE-ADJACENT ZONE OF BED OF FORCE WELL WITH WASHING OF TRANSFER WATER DUCT | 2005 |
|
RU2293175C1 |
CLEANING METHOD FOR BOTTOMHOLE FORMATION ZONE OF INJECTION WELL | 2006 |
|
RU2306405C1 |
METHOD FOR CLEANING NEAR WELLBORE REGION OF INJECTION WELLS | 2007 |
|
RU2332557C1 |
INJECTION WELL HEAD TUBING | 2005 |
|
RU2300623C1 |
SYSTEM FOR FORMATION PRESSURE KEEPING | 2004 |
|
RU2269647C1 |
WATER-INTAKE CAPACITY BALANCING METHOD OF TWO WELLS | 2011 |
|
RU2440492C1 |
METHOD OF CLEANING OF NEAR WELLBORE REGION OF INJECTION WELLS | 2013 |
|
RU2537430C1 |
METHOD FOR CLEANING THE BOTTOMHOLE FORMATION ZONE OF A WELL | 2021 |
|
RU2775368C1 |
METHOD OF TREATING BOTTOM ZONE OF INJECTING WELLS | 2003 |
|
RU2244113C1 |
METHOD FOR OIL FIELD DEVELOPMENT | 2006 |
|
RU2302517C1 |
Authors
Dates
2013-07-27—Published
2012-02-13—Filed