FIELD: process engineering.
SUBSTANCE: invention relates to pipe rolling. ESR blanks are heated to ductility temperature and pierced at screw rolling stand to sleeves-blanks. Jar carbon washers are heated to ductility temperature. Mandrel with mandrel ring is fitted into mandrel head, jar carbon washer is fitted on carbon ring, mandrel is fitted in sleeve or hollow ESR ingot-billet to fit jar carbon washer to get seed ends and composite billet. Jar carbon ring for making of seed ends has cylindrical and conical sections. Conical part of said jar washer is used to centre sleeve front end or that of hollow ingot-billets relative to mandrel axis. Assembled sleeve is shaped at variable-profile gages to steel pipe with seed end and pilgrim head fitted on carbon jar washers.
EFFECT: complete rolling of sleeve and hollow ingot-billet front ends.
5 cl, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
PREPARATION OF ESR INGOTS-BILLETS FROM ALLOYED GRADES OF STEEL AND ALLOYS TO PILGER PIPE ROLLING | 2012 |
|
RU2527521C2 |
METHOD OF MAKING STEEL PIPES OF SIZE 290X11-12 MM USING PIPE ROLLING PLANT "ТПУ" 8-16" WITH PILGRIM MILLS FROM LOW-DUCTILE STEELS OF GRADES 04X14T3P1"Ф-Ш" AND 04X14T5P2"Ф-Ш" | 2012 |
|
RU2502571C1 |
METHOD FOR PRODUCING BY ELECTROLAG REFINING INGOT-BLANKS OF HARD-TO-FORM STEELS AND ALLOYS AND FOR ROLLING OF THEM COMMERCIAL TUBES OF LARGE AND MEAN DIAMETERS IN TUBE ROLLING PLANTS WITH PILGER MILLS AND CONVERSION TUBES FOR FURTHER REROLLING IN TUBE COLD ROLLING MILLS | 2006 |
|
RU2322317C2 |
PRODUCTION OF SEAMLESS REROLLED PIPES SIZED TO 289×11,5×26000-27000 AND 290×12×26000-27500 mm AT PRU 8-16" WITH PILGER MILLS FROM ESR INGOTS-BILLETS OF LOW-DUCTILITY "04Х14Т3Р1Ф-Ш" AND "04Х14Т5Р2Ф-Ш"-GRADE STEELS WITH BORON CONTENT OF 1,3-3,5% FOR PRODUCTION OF HEXAGONAL PIPES-BILLETS SIZED TO TURNKEY BASIS OF 257+2,0/-3,0×6,0+2,0/-1,0×4300+80/-30 mm FOR COMPACT STORAGE IN NUCLEAR POWER STATION COOLING POND AND TRANSPORTATION OF USED NUCLEAR FUEL | 2012 |
|
RU2530085C2 |
PRODUCTION OF 465×75 MM SEAMLESS HOT-ROLLED PIPES FOR STEAM BOILERS, STEAM PIPELINES AND MANIFOLDS OF PLANTS WITH HIGH AND SUPERHIGH STEAM PARAMETERS FROM ESR INGOTS OF "10Х9МФБ-Ш"-GRADE STEEL | 2012 |
|
RU2527587C2 |
PRODUCTION OF LONG-SIZED 265×22×13000±300 AND 285×25×11750±50 mm-TUBE STOCK FROM HOLLOW ESR INGOTS-BILLETS OF "08Х10Н20Т2" AND "08Х10Н16Т2" GRATE STEEL FOR SUBMARINE PERISCOPE DRIVES | 2012 |
|
RU2527591C2 |
METHOD OF PRODUCING OF TUBE STOCK SIZED TO 290X12 MM TO SPECS 8-16 | 2012 |
|
RU2511199C1 |
METHOD FOR PRODUCING INGOT-BLANKS BY ELECTROSLAG REFINING OF HARD-TO-FORM STEELS AND ALLOYS AND FOR ROLLING OF THEM COMMERCIAL TUBES OF LARGE AND MEAN DIAMETERS IN TUBE ROLLING PLANTS WITH PILGER MILLS AND CONVERSION TUBES FOR REROLLING IN TUBE COLD ROLLING MILLS | 2006 |
|
RU2322316C2 |
METHOD FOR PRODUCTION OF BAR-INGOTS BY ELECTROSLAG REMELT FROM ALLOYED AND LOW-ALLOYED STEEL GRADES, ROLLING OF COMMERCIAL AND CONVERSION PIPES OF LARGE AND MEDIUM DIAMETERS ON TUBE-ROLLING PLANTS WITH PILGER ROLLING MILL | 2006 |
|
RU2346765C2 |
CROSS-SCREW-ROLLING MILL PROCESS TOOL FOR PIERCING-ROLLING-OFF OF LARGE-DIAMETER ELECTROSLAG-REMELTING SLEEVE BLANKS AND HOLLOW INGOTS FROM ALLOYED HARDLY-DEFORMED GRADES OF STEEL AND ALLOYS | 2012 |
|
RU2517068C1 |
Authors
Dates
2015-02-20—Published
2013-02-08—Filed