FIELD: construction.
SUBSTANCE: below versions of the method are applied: a projection is formed and when it is being hardened, it is attached to a sleeper after loss of its material of fluidity during the hardening process; first, a projection is made, and then, it is attached to the sleeper during its hardening; a projection is made, and then, it is attached to the manufactured sleeper; the projection is formed and attached to the manufactured sleeper during hardening of material of the projection.
EFFECT: eliminating difficulty of obtaining an item of a complex configuration with simultaneous manufacture of the body of the item and its toothed projections; considerable simplification of a manufacturing process of rail supports of an innovative structure; improving use efficiency of sleepers removed after replacement of worn-out rails.
4 cl
Title | Year | Author | Number |
---|---|---|---|
PRODUCTION OF ROAD-METAL | 2014 |
|
RU2556550C1 |
METHOD OF HEAT AND MOISTURE TREATMENT OF CONCRETE ARTICLES | 2015 |
|
RU2584907C1 |
REINFORCED CONCRETE SLEEPER | 2013 |
|
RU2536433C2 |
SLEEPER | 2012 |
|
RU2499860C2 |
REINFORCED CONCRETE SLEEPER | 2016 |
|
RU2631148C1 |
REINFORCED CONCRETE SLEEPER | 2012 |
|
RU2504610C1 |
METHOD FOR PRODUCTION OF RAIL SLEEPER, RAIL SLEEPER FOR ITS IMPLEMENTATION | 2019 |
|
RU2701074C1 |
SLEEPER | 2018 |
|
RU2675743C1 |
OUTHANG OF SLEEPER | 2017 |
|
RU2646703C1 |
TOOTHED SLEEP | 2017 |
|
RU2653978C1 |
Authors
Dates
2015-03-20—Published
2014-02-07—Filed