FIELD: aircraft engineering.
SUBSTANCE: spacecraft comprises the body with complex of service onboard systems, payload and units for assembly with separation system. Said body consists of interconnected end and side plates. Said units for assembly with separation system are fitted on coupling board mounted at the body with the help of pivots and pins coupled by swing controlled bars. Said pivots are secured at the body end plates. Coupling plate can be rearranged from the body end plate to one of said side plates by revolving on said pivots and pins. Besides, it can be secured to the body at two positions by coupling the attachment elements with mating elements arranged at end plate and one of the body end plates. Said swing controlled bar consists of two half-bars coupled by tie bar.
EFFECT: spacecraft docking at various positions with different types of carrier rockets with the help of structurally identical separation system.
2 cl, 8 dwg
Title | Year | Author | Number |
---|---|---|---|
CROSS BAR FOR DOCKING OF LARGE SPACE VEHICLE WITH CARRIER ROCKET EQUIPPED WITH SUPERCALIBER PAYLOAD FAIRING | 2007 |
|
RU2362724C2 |
MICRO-SATELLITE FOR EARTH SURFACE REMOTE SENSING | 2010 |
|
RU2457157C1 |
SPACECRAFT UNDOCKING SYSTEM AND METHOD FOR ASSEMBLY AND INSTALLATION THEREOF | 2015 |
|
RU2586942C1 |
SPACE PLATFORM | 2008 |
|
RU2376212C1 |
ADAPTER FOR THE SPACE CRAFTS INSTALLATION | 2017 |
|
RU2661375C1 |
SPACECRAFT UNDOCKING SYSTEM | 2012 |
|
RU2514981C2 |
METHOD OF SEPARATION FROM THE ROCKET-CARRIER OF A GROUP OF SPACECRAFTS AND THE DEVICE FOR ITS IMPLEMENTATION | 2017 |
|
RU2670359C2 |
CONTAINER | 2007 |
|
RU2360856C2 |
PAYLOAD SEPARATION SYSTEM | 2009 |
|
RU2396191C1 |
MULTI-PURPOSE SERVICE PLATFORM TO PRODUCE SPACE SHIPS | 2008 |
|
RU2375267C1 |
Authors
Dates
2015-11-10—Published
2014-04-16—Filed