FIELD: oil and gas industry.
SUBSTANCE: method of development of viscous oil fields includes creation in the formation of the zone of formation oxidating and thermodynamic processes by insertion in the horizontal part of the casing in the injection well of the bottomhole gas generator, and by fuel component ignition in it: fuel with oxidant, and admixture to the combustion products of the pre-heated water. At that the fuel, oxidant and heated water are injected though several coiled tubings in the bottomhole gas generator. Water by the water pump is injected in the water heater installed upstream the coiled tubing. The fuel components are ignited in the bottomhole gas generator using the ignition plug, and the bottomhole gas generator is slowly moved using the synchronous operation of the coiled tubings along the entire horizontal part of the casing towards wellhead. Then the bottomhole gas generator is removed from the heating well. Tubing string with the well filters in the horizontal part of the casing is run in it, and production of the liquid phase, gas fractions and light evaporated oil products are produced, separated and cleaned.
EFFECT: increased process efficiency and safety assurance.
18 cl, 19 dwg, 2 tbl
Title | Year | Author | Number |
---|---|---|---|
VISCOUS OIL DEVELOPMENT METHOD AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) | 2014 |
|
RU2574085C1 |
DEVICE FOR SCAVENGER OIL DEVELOPMENT | 2016 |
|
RU2620507C1 |
DOWNHOLE GAS GENERATOR | 2014 |
|
RU2569382C1 |
METHOD AND DEVICE FOR HEATING PRODUCING OIL-BEARING FORMATION | 2014 |
|
RU2569375C1 |
PACKER | 2015 |
|
RU2590171C1 |
DEVICE FOR SEPARATION OF INDIVIDUAL SECTIONS OF WELL SHAFT | 2015 |
|
RU2597337C1 |
HEAVY HYDROCARBONS INTRAFORMATIONAL MOLECULAR MODIFICATION METHOD AND DEVICE FOR ITS IMPLEMENTATION | 2015 |
|
RU2611873C1 |
METHOD FOR COMBINED EFFECT ON FORMATIONS CONTAINING HYDROCARBONS AND/OR SOLID ORGANIC SUBSTANCES AND DEVICE FOR IMPLEMENTING SAID METHOD | 2015 |
|
RU2576267C1 |
METHOD FOR DEVELOPMENT OF SHALE OIL AND GAS BEARING DEPOSITS AND PROCESS SYSTEM OF EQUIPMENT FOR ITS APPLICATION | 2014 |
|
RU2547847C1 |
PROCEDURE FOR DEVELOPMENT OF HIGH VISCOUS OIL DEPOSIT | 2010 |
|
RU2421609C1 |
Authors
Dates
2015-11-10—Published
2014-10-21—Filed