FIELD: oil and gas industry.
SUBSTANCE: method includes placing at the upper butt end of the tested well construction unit of sensors of acoustic pulse transmitter and receiver, which are coupled acoustically to the above unit, emitting of acoustic pulses and recording of secondary signals. Upon emitting and recording of acoustic pulses the sensors of transmitter and receiver are moved in sequence each 90-60° in circumferential direction of the tested construction unit in the well, they are mounted diametrically opposed to each other, sounding acoustic pulses are generated at two frequencies of 2 kHz and 5 kHz, the reflected signal is recorded at two 3T and 5T-periods and 4-6 measurements are performed in circumferential direction, interpretation of test results are made by summing up data received using two operating frequencies of 2 kHz and 5 kHz and two periods 3T and 5T, 360° sweep is plotted at contact surface of the well construction element of column-cement with received data of cement cohesion with the column along the whole perimeter of the well and identification of vertical defects in cement.
EFFECT: improved efficiency for determination of cement quality for the well construction units.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
ACOUSTIC METHOD FOR CONTROLLING QUALITY OF CEMENTING ELEMENTS OF WELLS CONSTRUCTION | 2003 |
|
RU2238404C1 |
METHOD FOR MONITORING THE QUALITY AND TIGHTNESS OF WELL CEMENTING | 2020 |
|
RU2743917C1 |
METHOD FOR LOCALIZING SOURCES OF NON-NATURAL POLLUTION OF WATER-BEARING HORIZONS | 2003 |
|
RU2239058C1 |
METHOD TO DETERMINE GAS-SATURATED INTERVALS IN CASING ANNULUS OF WELL | 2006 |
|
RU2304215C1 |
OIL GAS WELL GROUTING CHECKING METHOD | 0 |
|
SU981914A1 |
METHOD OF DETERMINING PARAMETERS OF ACOUSTIC PROBE FOR TESTING OIL-GAS WELL CEMENTATION | 0 |
|
SU890315A1 |
ACOUSTIC METHOD OF ESTIMATION OF CEMENT DISTRIBUTION BEHIND TUNNEL LINING | 2005 |
|
RU2301403C2 |
METHOD OF ESTIMATING QUALITY OF CEMENTING BOREHOLES | 1990 |
|
RU2006883C1 |
METHOD OF DETECTING INTERVALS OF OFF-CASING COMMUNICATION | 0 |
|
SU968361A1 |
METHOD OF INVESTIGATED THE STATE OF A CASED WELL | 0 |
|
SU883374A1 |
Authors
Dates
2016-01-20—Published
2015-04-15—Filed