FIELD: construction.
SUBSTANCE: method is based upon estimation of distribution of cement solution along perimeter, which cement solution is pumped in inside reinforced concrete lining of tunnel of subway, for example. Acoustic pulses are irradiated and parameters of their propagation are registered by means of radiator and receiver, mounted onto tunnel lining; receiver and irradiator are acoustically connected with body of lining. Results are subject to interpretation on base of empiric dependence, which relates average thickness of cement behind tunnel lining to acoustic signal decay decrement.
EFFECT: improved truth of results; reduced labor input.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
ACOUSTIC METHOD FOR CONTROLLING QUALITY OF CEMENTING ELEMENTS OF WELLS CONSTRUCTION | 2003 |
|
RU2238404C1 |
ACOUSTIC METHOD TO DETERMINE CEMENTING QUALITY FOR WELL CONSTRUCTION UNITS | 2015 |
|
RU2572870C1 |
METHOD OF ASSEMBLED OR SEMI-ASSEMBLED MULTILAYER WATER-PROOF STRUCTURE CONSTRUCTION ON GROUND AND METHOD OF MONITORING STRUCTURE CONTACT TO GROUND | 2008 |
|
RU2367742C1 |
METHOD FOR CONTROLLING QUALITY OF INSTALLATION OF ANCHOR ROD IN WELL | 1991 |
|
RU2011748C1 |
METHOD OF ULTRASONIC INSPECTION OF POLYMERS FOR STRENGTH LIMIT AT BREAK | 2006 |
|
RU2319957C2 |
METHOD FOR DETERMINING STRENGTH OF CONCRETE BY ACOUSTIC EMISSION METHOD | 2022 |
|
RU2807868C1 |
METHOD FOR DIAGNOSING THE TECHNICAL CONDITION OF A PIPELINE BY ANALYZING THE MODAL DAMPING DECREMENT | 2022 |
|
RU2778631C1 |
ACOUSTIC METHOD FOR QUALITY CONTROL OF LIQUID COLUMN IN THE COURSE OF ITS FORMATION | 1999 |
|
RU2172802C1 |
METHOD OF ACOUSTIC WELL-LOGGING OF GAS AND OIL WELLS | 0 |
|
SU972443A1 |
METHOD OF DETERMINING SETTLEMENT OF THE EARTH'S SURFACE AND STRUCTURES DURING CONSTRUCTION OF UNDERGROUND TUNNELS | 2023 |
|
RU2823901C1 |
Authors
Dates
2007-06-20—Published
2005-05-20—Filed