FIELD: oil and gas industry.

SUBSTANCE: method of installation of well bore connection assembly in the well includes the stages, when the first pipe string is installed in the deflecting tool. Sealing interaction of the first pipe string in the deflecting tool is performed. Flow control device is opened by the first pipe string as response to insertion. The well system contains a deflecting device located at crossing between the first, the second and the third sections of the well bore. The pipe strings connector contains the first and the second pipe strings connected with its end. The first pipe string is installed in the deflecting device and ensures sealing interaction with seal in the deflecting device, and functionally interacts with the flow control device installed in the first section of the well bore. The second pipe string is installed in the second section of the well bore.

EFFECT: increased efficiency factor.

14 cl, 10 dwg

Similar patents RU2576413C2

Title Year Author Number
WELL BORE CONNECTION ASSEMBLY WITH VARIABLE CONFIGURATION 2012
  • Stil Devid Dzh.
  • Ranzheva Zhan-Mishel
RU2588999C2
VARIABLE-CONFIGURATION BOREHOLE ASSEMBLY 2012
  • Stil Devid Dzh.
  • Ranzheva Zhan-Mishel
RU2719842C2
DEVICE AND METHODS FOR FORMATION AND USE OF UNDERGROUND SALT CAVERN 2010
  • Tandzhet Brjus Ehrnol'D
RU2531955C2
ENERGY TRANSMISSION MECHANISM FOR A CONNECTION UNIT OF A BOREHOLE 2017
  • Stil, Devid, Dzho
  • Godager, Ojvinn
  • Chzhun, Syaoguan, Allen
RU2744466C1
ENERGY TRANSMISSION MECHANISM FOR A CONNECTION JOINT FOR CONNECTION WITH A LATERAL WELL FINISHING TOOL 2017
  • Steele, David Joe
RU2745682C1
ENERGY TRANSFER MECHANISM FOR CONNECTING NODE OF BOREHOLE 2017
  • Stil, Devid Dzho
  • Godager, Ojvinn
  • Chzhun, Syaoguan Allen
RU2761941C2
METHOD FOR PROVIDING FOR CONNECTION BETWEEN SHAFT OR SHAFTS OF SIDE BRANCH WITH BARE MAIN SHAFT OF WELL AND DEVICE FOR REALIZATION OF SAID METHOD, SYSTEM FOR COMPLETING WELL HAVING SIDE BRANCH, METHOD FOR CONNECTING EQUIPMENT OF MAIN SHAFT OF WELL TO EQUIPMENT OF SIDE SHAFT AND DEVICE FOR REALIZATION OF SAID METHOD 1999
  • Omer Ehrve
  • Brokman Mark
  • Gotlib Mikhail
  • Frels Majkl V.
RU2239041C2
SYSTEM AND PROCEDURE FOR BOREHOLE OF WELL PERFORATION 2007
  • Khromas Dzho K.
  • Grigar Larri
RU2428561C2
WIPER PLUG FOR DETERMINING ORIENTATION OF CASING STRING IN WELL BORES 2013
  • Stil Devid Dzho
RU2631376C1
COMPATIBLE WITH CABLE AND CONTROLLED BY A NON-LIFT METHOD, CONFIGURED TO INTERACT WITH ANNULAR SPACE SYSTEM FOR USE AND ELIMINATION OF UNDERGROUND WELL 2012
  • Tandzhet Bryus E.
RU2689933C2

RU 2 576 413 C2

Authors

Stil Devid Dzh.

Dates

2016-03-10Published

2012-05-18Filed