FIELD: geology; oil industry.
SUBSTANCE: invention relates to oil geology and can be used for optimisation of arrangement of exploration and production wells on investigated object. Essence: seismic surveys are conducted. Wells are drilled with extracting cores from target formations. Geophysical survey and testing of wells is carried out. Prediction seismic maps are constructed on survey area. Obtained based on borehole and seismic investigations map of effective thickness, as well as map of minimum and maximum effective thicknesses and dispersions of effective thicknesses of formations are transformed to numerical format. Based on obtained map of effective thicknesses lithological trend three-dimensional model of formation or deposit is constructed. Based on lithologic trend three-dimensional model of formation or deposit, generating multiple lithological cubes with different ranks of semivariograms. Constructing a nomogram indicating dependence of error models from ranks of semivariograms. Selecting set of most reliable cube models of lithology and based thereon, constructing cubes porosity and oil and gas saturation of rock. Considering obtained said geological models, estimation is carried out of resource base of deposit and places of possible location of new designed wells are determined. Then, based on of all available data in model with best geological and ecological and economic point of view properly place new wells.
EFFECT: technical result is improved accuracy of justification of new wells, reduced load on environment.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SPACING OF THE PROSPECTING, DEVELOPMENT AND PRODUCTION WELLS ON THE OIL AND NATURAL GAS FIELDS BASED ON THE THREE-DIMENSIONAL GEOLOGIC MODEL | 2006 |
|
RU2305301C1 |
METHOD OF INTEGRATING INITIAL DATA TO UPDATE FILTRATION STRUCTURE OF NON-UNIFORM CARBONATE RESERVOIRS | 2017 |
|
RU2661489C1 |
METHOD OF RESERVOIRS SATURATION PREDICTION BASED ON COMPLEX ANALYSIS OF DATA CPP, STM, GIS | 2019 |
|
RU2700836C1 |
METHOD FOR CONSTRUCTION OF GEOLOGICAL-HYDRODYNAMIC MODELS OF NON-HOMOGENEOUS RESERVOIRS WITH THIN INTERLENSING OF SAND-SILT AND CLAY ROCKS | 2017 |
|
RU2656303C1 |
METHOD FOR LOCALIZING RESERVES OF FRACTURED SILICEOUS RESERVOIRS | 2023 |
|
RU2814152C1 |
METHOD OF ADAPTATION OF HYDRODYNAMIC MODEL OF PRODUCTIVE FORMATION OF OIL AND GAS CONDENSATE DEPOSIT TAKING INTO ACCOUNT UNCERTAINTY OF GEOLOGICAL STRUCTURE | 2019 |
|
RU2709047C1 |
METHOD OF BAZHENOV FORMATION DEPOSITS DOUBLE MEDIUM GEOLOGIC AND HYDRODYNAMIC MODELS CONSTRUCTING | 2014 |
|
RU2601733C2 |
METHOD OF ESTIMATING WAVE FIELD ATTENUATION PARAMETER FOR DETERMINING HYDROCARBON SATURATION OF FORMATION IN BOREHOLE SPACE IN CONSTRUCTING GEOLOGICAL MODEL | 2018 |
|
RU2718137C1 |
METHOD FOR DETERMINING FOUNDATION POINTS OF OPERATION WELLS DURING EXTRACTION OF HYDROCARBON DEPOSITS | 2005 |
|
RU2274878C1 |
METHOD FOR JOINT INVERSION OF SEISMIC AND ELECTRICAL DATA | 2020 |
|
RU2772312C1 |
Authors
Dates
2016-03-27—Published
2013-12-24—Filed