FIELD: construction.
SUBSTANCE: bridge-layer consists of ready bridge and comprises conveyor with rotary platform equipped with two levers, which are coupled with one end of laid bridge, and has intermediate chassis supporting the axle at a distance from conveyor is not less than the distance from conveyor to the centre of gravity of “bridge-transporter” coupling, the second end of the bridge is equipped with loops for connection of helicopter or helicopter cluster. Or the second end of the bridge has two or more rocket engines with resultant thrust more than half the weight of the bridge.
EFFECT: disclosed is a device for laying finished bridges on the prepared and not prepared platform mainly in combat conditions.
10 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OVERCOMING OBSTACLES / VERSIONS/ | 2014 |
|
RU2577748C1 |
METHOD OF OVERCOMING OBSTACLES-2 | 2015 |
|
RU2578447C1 |
TRENCHING MACHINE | 2015 |
|
RU2593504C1 |
ROCKET LAUNCHER AND ROCKET (VERSIONS) | 2012 |
|
RU2499973C1 |
STAROVEROV TANK | 2015 |
|
RU2580379C1 |
UNIFIED BRIDGE COMPLEX | 2001 |
|
RU2212489C2 |
PORTABLE SURFACE-TO-AIR MISSILE SYSTEM /VERSIONS/ | 2012 |
|
RU2514324C1 |
DEVICE FOR AIRCRAFT TAKE-OFF (VERSIONS) | 2015 |
|
RU2583401C1 |
DEVICE FOR CONNECTING HELICOPTERS (VERSIONS) | 2010 |
|
RU2446991C1 |
COMBAT SYSTEM | 2017 |
|
RU2659178C1 |
Authors
Dates
2016-06-10—Published
2015-03-04—Filed