METHOD OF INTERVAL TREATMENT OF BOTTOM HOLE ZONE OF HORIZONTAL WELL SHAFT Russian patent published in 2016 - IPC E21B43/16 E21B43/27 E21B37/06 

Abstract RU 2599156 C1

FIELD: oil and gas industry.

SUBSTANCE: invention relates to oil industry and can be used in treatment of bottom-hole zone of horizontal boreholes opening carbonate collector. According to the method is determined a pressure of fluid absorption in open horizontal borehole. Performs processing of open horizontal borehole for liquidation of absorption. After treatment at the wellhead collected from bottom to top and is lowered into open horizontal shaft, which consists of a perforated liner with centralizers, the packer, disconnector, the process pipes string. Performs lowering of the packaging arrangement into an open horizontal borehole. Descent of it is lowering up to the lower end of a perforated liner of bottom horizontal borehole. Then inside a perforated liner is lowered a string pump-compressor tubes - PCT and up to 5 m till the lower end of the tubing string PCT of he lower end of a perforated liner lowering of tubing string PCT is stopped. At the wellhead top end of the production string is equipped with casing valve with casing-head stuffing box. Upper end of the process pipe string is equipped with shell valve with stuffing box. On upper end of the tubing pipe PCT tube valve is mounted. Pumped into the casing space invert emulsion until it appears at the wellhead. Casing valve is closed and opened shell and tube valves. Invert emulsion is pumped via the tubing string PCT to shell space until the appearing of inverted emulsion at the wellhead from shell space. Pumping is stopped and closed shell valve. Casing valve is opened. Performs interval treatment of horizontal shaft, which is divided into sections with length at 50 m, starting from the section from bottom hole. For this purpose, at closed casing valve and opened tube and shell valves in tubing string PCT is injected acid composition and flushed it in casing space in a value equal to the volume of the casing space between tubing string PCT and a perforated liner at the length of processed section. Shell valve is closed. Casing valve is opened and with a reverse emulsion launched on the surface, acid composition is forced via the tubing string PCT from casing space between tubing string PCT and perforated liner at the length of processed section to the bottom hole zone of bench along the whole length of processed section. Waiting for response within 12 hours. Invert emulsion is pumped to the tubing string PCT and displaced the reaction products from horizontal shaft in vertical part. Tubing string PCT is moved to the next interval. After processing of all sections of horizontal shaft the tubing string PCT is lowered to bottom. Casing valve is closed and opened shell valve. In the tubing string PCT marketable oil is pumped until it appears at the mouth of the shell space. Then the packer is installed. Disconnector is disconnected and process pipe string removed from the well. Perforated liner is left in the horizontal well bore. Borehole is equipped with well operating equipment and put into operation.

EFFECT: high efficiency of processing.

1 cl, 2 dwg

Similar patents RU2599156C1

Title Year Author Number
METHOD OF TREATMENT OF BOTTOM-HOLE ZONE OF THE HORIZONTAL SHAFTS OF BOREHOLES, OPENING CARBONATE COLLECTOR 2015
  • Makhmutov Ilgizar Khasimovich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
RU2599155C1
METHOD OF THERMOFOAM-ACID TREATMENT OF NEAR-WELL ZONE OF CARBONATE RESERVOIR 2016
  • Ismagilov Fanzat Zavdatovich
  • Khabibrakhmanov Azat Gumerovich
  • Novikov Igor Mikhajlovich
  • Latypov Rustam Robisovich
  • Nafikov Askhat Akhtyamovich
  • Podavalov Vladlen Borisovich
  • Nigmatullin Marat Makhmutovich
  • Gavrilov Viktor Vladimirovich
  • Nigmatullin Ilsur Magsumovich
  • Musabirov Munavir Khadeevich
  • Abusalimov Eduard Marsovich
  • Dmitrieva Alina Yurevna
  • Musabirova Natalya Mikhajlovna
  • Orlov Evgenij Grigorevich
  • Yarullin Rinat Ravilevich
RU2638668C1
METHOD OF INTERVAL-BY-INTERVAL TREATMENT OF PRODUCING FORMATION WITH OPEN HORIZONTAL BOREHOLE 2014
  • Musabirov Munavir Khadeevich
  • Ismagilov Fanzat Zavdatovich
  • Khannanov Rustehm Gusmanovich
  • Abusalimov Ehduard Marsovich
  • Daminov Arslan Mirgajazovich
  • Musabirova Natal'Ja Mikhajlovna
RU2570179C1
PROCEDURE FOR SELECTIVE ISOLATION AND RESTRAINT OF WATER PRODUCTION INTO HORIZONTAL WELLS 2008
  • Pavlov Ivan Vladimirovich
  • Akimov Nikolaj Ivanovich
  • Kazanbaeva Oksana Vladimirovna
RU2363841C1
METHOD OF INTERVAL PRODUCTIVE FORMATION TREATMENT IN OPEN HORIZONTAL BORE OF WELL 2016
  • Makhmutov Ilgizar Khasimovich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
RU2618249C1
METHOD OF SELECTIVE TREATMENT OF PRODUCTIVE CARBONATE FORMATION 2015
  • Musabirov Munavir Khadeevich
  • Ismagilov Fanzat Zavdatovich
  • Latypov Rustam Robisovich
  • Bashkirtseva Natalya Yurevna
  • Kuryashov Dmitrij Aleksandrovich
  • Rakhmatullin Rafael Rafkhatovich
  • Abusalimov Eduard Marsovich
RU2610967C1
METHOD FOR INTERVAL-AFTER-INTERVAL TREATMENT OF BOTTOM-HOLE ZONE OF HORIZONTAL WELLS 1998
  • Kudinov V.I.
  • Bogomol'Nyj E.I.
  • Suchkov B.M.
  • Kamenshchikov F.A.
RU2144616C1
PROCESS OF BOTTOM-HOLE TREATMENT 2002
  • Zhuravlev S.R.
  • Kondrat'Ev D.V.
RU2222697C1
WELL COMPLETION METHOD, EXPOSING PRODUCTIVE FORMATION, LOCATED IN ISOLATION FROM WATER-BEARING FORMATION 2015
  • Khisamov Rais Salikhovich
  • Gumarov Nafis Faritovich
  • Minnullin Rashit Mardanovich
  • Faskhutdinov Ruslan Rustyamovich
RU2593281C1
BOTTOMHOLE ZONE TREATMENT METHOD FOR HORIZONTAL WELL 2013
  • Fajzullin Ilfat Nagimovich
  • Khurrjamov Al'Fis Mansurovich
  • Ramazanov Rashit Gaznavievich
  • Gubaev Rim Salikhovich
  • Sulejmanov Farid Bashirovich
RU2527434C1

RU 2 599 156 C1

Authors

Makhmutov Ilgizar Khasimovich

Salimov Oleg Vyacheslavovich

Ziyatdinov Radik Zyauzyatovich

Dates

2016-10-10Published

2015-09-24Filed