WELL COMPLETION METHOD, EXPOSING PRODUCTIVE FORMATION, LOCATED IN ISOLATION FROM WATER-BEARING FORMATION Russian patent published in 2016 - IPC E21B43/11 E21B43/27 E21B43/22 E21B7/04 

Abstract RU 2593281 C1

FIELD: oil and gas industry.

SUBSTANCE: invention can be used for intensification of oil production from carbonate reservoirs. Method comprises selecting a productive formation, located in isolation from water-saturated formation. Opening thereof with a horizontal well far from water reservoir at a distance of more than 5 m from said formation. Running string of tubing string with starting clutches and with a funnel at its end. Funnel is placed in the range of the production string shoe. Flexible flush-joint pipe is lowered with a jet nozzle at end inside tubing string. Jet nozzle is introduced in horizontal uncased well and acid solution is placed at bottom hole, which is selected in volume equal to volume of annular space of well. Horizontal borehole is filled with aqueous solution of surfactant. Aqueous solution of surfactant is forced through flush-joint pipe into productive formation. At closed annular and tube space through annular space acid solution is flushed in well shaft, with flow rate providing for effect of water jet "cutting" rock, with stepped pressure rise and process exposure at each stage. Pressure from step to step is raised from 3 to 6 MPa. Process exposure at each stage is performed until pressure drops to 2 MPa. Well bore is washed, flexible flush-joint pipe is lifted from well, inert gas is pumped through annular space with extraction of liquid via tubing string. Killing fluid is pumped into well. Well is developed. Geophysical survey of horizontal shaft on flexible pipe is performed. “Inactive” intervals of horizontal shaft, having high permeability and porosity, are identified. Jet nozzle is installed at said intervals of horizontal shaft. Jet nozzle is directed at an angle to axis of horizontal shaft with thrust end of jet nozzle in wall of horizontal shaft. Acid solution circulates through flexible flush-joint pipe, jet nozzle and tubing string with creation of flow rate, providing effect of water jet "cutting" rock till recess in rock or channel and increase surface area exposure interval. Through annular space acid solution is flushed into formation. Soaking takes place so that acid solution could react with rock. Flexible flush-joint pipe with jet nozzle is lifted out of well. Inert gas is pumped through annular space with extraction of liquid via tubing string. Lifting speed is measured level of liquid in the well. Well is filled with killing fluid. Tubing string is lifted from well with starting clutches and funnel at its end. Downhole pumping equipment is lowered and the well in operation.

EFFECT: high efficiency of processing well.

1 cl, 1 ex

Similar patents RU2593281C1

Title Year Author Number
WELL COMPLETION METHOD 2014
  • Khisamov Rais Salikhovich
  • Rakhmanov Ajrat Rafkatovich
  • Minnullin Rashit Mardanovich
  • Faskhutdinov Ruslan Rustjamovich
RU2541988C1
WELL COMPLETION METHOD 2014
  • Khisamov Rais Salikhovich
  • Gumarov Nafis Faritovich
  • Minnullin Rashit Mardanovich
  • Musabirov Munavir Khadeevich
  • Akhmetshin Rubin Mudarisovich
  • Faskhutdinov Ruslan Rustjamovich
RU2541986C1
HORIZONTAL WELL COMPLETION METHOD 2015
  • Ibragimov Nail Gabdulbarievich
  • Sagatov Ramis Fanisovich
  • Aslyamov Ajrat Ingelevich
  • Garaev Rafael Rasimovich
  • Absalyamov Ruslan Shamilevich
RU2588108C1
WELL COMPLETION METHOD, EXPOSING PRODUCTIVE FORMATION LOCATED NEAR WATER-SATURATED FORMATION 2015
  • Khisamov Rais Salikhovich
  • Gumarov Nafis Faritovich
  • Minnullin Rashit Mardanovich
  • Faskhutdinov Ruslan Rustjamovich
RU2579069C1
METHOD FOR WELL COMPLETION 2012
  • Ibragimov Nail' Gabdulbarievich
  • Rakhmanov Ajrat Rafkatovich
  • Minnullin Rashit Mardanovich
  • Faskhutdinov Ruslan Rustjamovich
  • Garaev Rafaehl' Rasimovich
RU2490442C1
ACID TREATMENT METHOD OF OPEN HORIZONTAL SHAFT OF WELLS 2020
  • Nasibulin Ilshat Maratovich
  • Asadullin Marat Fagimovich
  • Petrov Mikhail Aleksandrovich
  • Khasanova Natalya Anatolevna
RU2740505C1
WELL BOTTOMHOLE ZONE TREATMENT METHOD 2015
  • Kazantsev Sergej Andreevich
  • Skvortsov Dmitrij Evgenevich
  • Glebov Vadim Igorevich
RU2601960C1
METHOD FOR DEVELOPMENT OF MULTI-HOLE BRANCHED HORIZONTAL WELL 2014
  • Fajzullin Ilfat Nagimovich
  • Nabiullin Rustem Fakhrasovich
  • Gusmanov Ajnur Rafkatovich
  • Gubaev Rim Salikhovich
  • Sadykov Rustem Ildarovich
RU2581589C1
METHOD OF DRILLING AND DEVELOPMENT OF OFFSHOOT FROM HORIZONTAL WELL (VERSIONS) 2019
  • Makhmutov Ilgizar Khasimovich
  • Ziyatdinov Radik Zyauzyatovich
RU2709262C1
METHOD OF THERMOFOAM-ACID TREATMENT OF NEAR-WELL ZONE OF CARBONATE RESERVOIR 2016
  • Ismagilov Fanzat Zavdatovich
  • Khabibrakhmanov Azat Gumerovich
  • Novikov Igor Mikhajlovich
  • Latypov Rustam Robisovich
  • Nafikov Askhat Akhtyamovich
  • Podavalov Vladlen Borisovich
  • Nigmatullin Marat Makhmutovich
  • Gavrilov Viktor Vladimirovich
  • Nigmatullin Ilsur Magsumovich
  • Musabirov Munavir Khadeevich
  • Abusalimov Eduard Marsovich
  • Dmitrieva Alina Yurevna
  • Musabirova Natalya Mikhajlovna
  • Orlov Evgenij Grigorevich
  • Yarullin Rinat Ravilevich
RU2638668C1

RU 2 593 281 C1

Authors

Khisamov Rais Salikhovich

Gumarov Nafis Faritovich

Minnullin Rashit Mardanovich

Faskhutdinov Ruslan Rustyamovich

Dates

2016-08-10Published

2015-05-07Filed