METHOD OF STRESS CONCENTRATION RELATIVE CHANGES MEASURING IN FRONT OF MINING FACE FRONT Russian patent published in 2016 - IPC E21C39/00 

Abstract RU 2604532 C2

FIELD: data processing.

SUBSTANCE: method consists in fact that managing-recording server records oscillations measuring signals from three-dimensional geophone measuring probes installed in entries adjacent to longwall face, synchronously spatially oriented in all measuring channels and in synchronized time interval, as well as in close correlation with signals, informing on cleaning machine operation mode and location in working face and on this basis, during interaction with server localizes seismic phenomena. After cutter-loader each cut cutting analysis of relative changes of stress in coal massif is carried out in front of mining face front by seismic amplitude tomography weakening-attenuation using recorded wave energy. After cutting when loader is stationary, performing active seismic speed or amplitude tomography by illumination of rock mass between gates adjacent to longwall by means of seismic waves, caused by actuation of remote launched from mine surface, by means of converting server pulse oscillations exciters. Stress analysis is performed by passive seismic velocity or amplitude tomography method, using translucent seismic wave shocks as source of vibrations, caused by mining development.

EFFECT: then stresses relative changes concentration averaged tomographic map is periodically complied, and separate types of tomography maps are complied.

6 cl, 4 dwg

Similar patents RU2604532C2

Title Year Author Number
METHOD AND CIRCUIT FOR DETECTING AND MINIMIZING METHANE HAZARD IN AREA OF MINING FACE 2014
  • Isakow Zbigniew
  • Sicinski Kazimierz
  • Golabek Adam
RU2594917C1
METHOD AND SCHEME FOR ANALYSIS OF GEOLOGICAL STRUCTURE AND RELATIVE CHANGES OF STRESS IN LAYERS LOCATED OVER OPENINGS OF UNDERGROUND MINE 2014
  • Isakow Zbigniew
  • Sieradzki Przemyslaw
  • Pilecki Zenon
  • Sicinski Kazimierz
  • Czarny Rafal
RU2587521C1
METHOD AND SYSTEM FOR EVALUATING RISK OF HIGH-ENERGY SHOCKS CAUSED BY UNDERGROUND DEVELOPMENT 2014
  • Isakov Zbignev
  • Yuzva Yatsek
  • Pivovarski Veslav
  • Dzik Grazhina
RU2587520C1
METHOD AND SCHEME FOR SYNCHRONISATION OF SEISMIC AND SEISMOACOUSTIC MEASUREMENT CIRCUITS, ESPECIALLY MINE SPARK-PROOF NETWORKS 2014
  • Isakov Zbignev
  • Dvorak Marek
  • Augustynyak Adam
  • Sieradzki Pshemyslav
  • Koza Yanush
RU2587504C1
METHOD FOR MONITORING THE TECHNICAL CONDITION OF THE TUNNEL LINING USING THE SEISMOACOUSTIC METHOD 2022
  • Lebedev Mikhail Olegovich
  • Bojko Oleg Vladimirovich
  • Dorokhin Kirill Aleksandrovich
  • Isaev Yurij Sergeevich
  • Bezrodnyj Konstantin Petrovich
  • Shlyaev Sergej Alekseevich
RU2791457C1
METHOD OF DIAGNOSING DANGEROUS SITUATIONS IN DEEP MINING AND FORECASTING PARAMETERS OF FISSURING ZONES FORMED BY FRACTURING 2011
  • Efimov Arkadij Sergeevich
  • Kulikov Vjacheslav Aleksandrovich
  • Sagajdachnaja Ol'Ga Markovna
  • Maksimov Leonid Anatol'Evich
  • Sibirjakov Boris Petrovich
  • Khogoev Evgenij Andreevich
  • Shemjakin Mark Leonidovich
RU2467171C1
METHOD FOR NON-EXPLOSIVE DESTRUCTION OF HARD SEAMY ROCKS 0
  • Yakovlev Yurij Ivanovich
SU1680979A1
METHOD FOR DETERMINING EMISSION HAZARD IN MINE WORKINGS DURING MINING OF COAL BEDS WITH HARD-TO-COLLAPSE ROOFS 2019
  • Dyrdin Valerij Vasilevich
  • Fofanov Andrej Alekseevich
  • Kim Tatyana Leonidovna
  • Plotnikov Evgenij Anatolevich
  • Smirnov Vyacheslav Gennadevich
  • Shepeleva Sofya Alekseevna
RU2700854C1
METHOD OF SEARCHING FOR HYDROCARBON DEPOSITS CONFINED TO FISSURED-CAVERNOUS COLLECTORS 2010
  • Baranov Valerij Dmitrievich
  • Erokhin Gennadij Nikolaevich
  • Kremlev Andrej Nikolaevich
  • Rodin Sergej Valentinovich
RU2451951C2
METHOD OF LOCATING SAFE RELIEF ZONE IN STOPE 0
  • Ayurov Valerij Dmitrievich
  • Babenko Veniamin Semenovich
SU1613644A1

RU 2 604 532 C2

Authors

Isakow Zbigniew

Dworak Marek

Golabek Adam

Dates

2016-12-10Published

2014-10-31Filed