FIELD: gas industry.
SUBSTANCE: invention relates to gas industry and can be used in development of deposits of natural gas, mainly at the stage of falling production and at the final stage of development. Method involves selective, during seasonal decrease of consumer demand for gas, shutdown of gas wells in operational zones located in the roof part of the structure with reduced, relative to the average for the deposit, formation pressure and the most close to the center of the depression funnel. Shutdown is performed for a period required for compensation of losses of the formation pressure due to inflow of gas from peripheral zones with a duration determined by results of the previous shutdown. Taken into account is the point of intersection of the first time derivative of the function of gas inflow intensity to the operating zone of the stopped wells and the first derivative of the function of intensity of potential gas production defined as the first derivative of dependence of maximum output of the current formation pressure in the zone at a specified constant value of pressure at the inlet of the gas field. After the shutdown controlled is the value of formation pressure in the zones to its stabilization after starting the wells into operation. Herewith the number of operating wells and process modes of their operation are selected so that the volumes of extracted gas are maximum compensated due to its inflow from adjacent zones.
EFFECT: technical result is increased efficiency of development of deposits of natural gas.
1 cl, 1 ex, 1 tbl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPMENT OF GAS FIELD | 2015 |
|
RU2605216C1 |
METHOD OF OPTIMIZATION OF THE PERIODICITY OF GASDYNAMIC WELL RESEARCH ON OIL AND GAS CONDENSATE FIELDS OF THE EXTREME NORTH | 2017 |
|
RU2661502C1 |
METHOD FOR GAS FIELD DEVELOPMENT AT THE FINAL STAGE | 2022 |
|
RU2790334C1 |
METHOD OF UPDATE OF THE GEOLOGICAL-GAS FLUE MODEL OF THE GAS DEPOSIT ACCORDING TO THE DATA OF OPERATION | 2017 |
|
RU2657917C1 |
METHOD FOR AUTOMATIC MONITORING OF GAS AND GAS-CONDENSATE WELLS IN FIELDS IN EXTREME NORTH | 2016 |
|
RU2645055C1 |
METHOD OF ADDITIONAL DEVELOPMENT OF WATER-FLOODED SECTIONS OF GAS-CONDENSATE DEPOSIT OF OIL AND GAS CONDENSATE DEPOSIT | 2019 |
|
RU2744535C1 |
METHOD FOR CLARIFYING RESERVOIR POROSITY AND PERMEABILITY OF FORMATION IN INTERWELL SPACE BY NUMERICALLY ADAPTING HYDRODYNAMIC MODEL TO RESULTS OF LARGE-SCALE GAS DYNAMIC STUDIES | 2023 |
|
RU2809029C1 |
METHOD FOR FURTHER DEVELOPMENT OF BOTTOM WATER-DRIVE RESERVOIR WITH LOW PRESSURE GAS RESERVES | 2015 |
|
RU2594496C1 |
METHOD FOR DEVELOPING FRACTURED-CAVERNOSIC DEPOSIT WITH GAS CAP AND UNDERLYING WATER | 2022 |
|
RU2808627C1 |
METHOD OF INCREASE OF CONDENSATE OUTPUT BY EXPLOITED OIL AND GAS CONDENSATE DEPOSIT OBJECT | 2019 |
|
RU2713553C1 |
Authors
Dates
2017-01-10—Published
2015-09-03—Filed