FIELD: mining.
SUBSTANCE: method includes a pulldown into methane coal well at the flow column with two-packer arrangement of downhole equipment, including screw pump, the surface pressure and temperature readout unit, selection by means of packers one of the broached coal beds of the studied methane coal well, thereafter provide lowering of the liquid level with the pace of depression creation to the productive coal bed not more than 0.3 atm/day and carry out the flow tests. Wherein, the flow tests are carried out in the second methane coal well, located 30-100 m away from the first methane coal well, for that purpose on the flow column with two-packer arrangement the downhole equipment is lowered, at that selecting by the packers the same productive coal bed, after completed tests the screw pump is stopped at the second methane coal well and conduct the flow tests on the first methane coal well.
EFFECT: improved accuracy and quality of coal beds flow tests of methane coal wells.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SELECTIVE ANALYSIS OF SEPARATE FORMATIONS OF COAL-METHANOL WELLS | 2015 |
|
RU2578143C1 |
DEVICE AND METHOD OF WELL HYDRODYNAMIC INVESTIGATIONS AND TESTS | 2001 |
|
RU2199009C2 |
WELL JET PLANT FOR SELECTIVE TESTING OF FORMATIONS | 2016 |
|
RU2631580C1 |
METHOD OF BOREHOLE AND WELLHEAD EQUIPMENT LAYOUT FOR WELL SURVEY ENVISAGING INJECTION OF INJECTION FLUID TO FORMATION AND EXTRACTION OF FLUIDS FROM FORMATION | 2013 |
|
RU2531414C1 |
EXPERIMENTATION METHOD FOR COAL-METHANOL WELLS USING OPTICAL FIBER | 2017 |
|
RU2667531C1 |
METHOD OF INVESTIGATION OF LEAKTIGHTNESS OR LEAKINESS OF PACKER SYSTEM AND CEMENT BRIDGE OF WELL | 2011 |
|
RU2475641C1 |
DOWNHOLE TESTING METHOD IN OPEN HOLE | 2016 |
|
RU2625126C1 |
METHOD OF DEVELOPING WELL OIL RESERVOIR WITH HORIZONTAL TERMINATION | 2015 |
|
RU2590918C1 |
METHOD OF SIMULTANEOUS SEPARATE OR SUCCESSIVE PRODUCTION OF RESERVOIR FLUID FROM WELL OF MULTIPAY FIELDS WITH PRELIMINARY INSTALLATION OF PACKERS | 2014 |
|
RU2552555C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTI LAYER DEPOSIT AND DEVICE FOR REALIZING SAID METHOD | 2014 |
|
RU2594235C2 |
Authors
Dates
2017-03-01—Published
2016-01-14—Filed