METHOD OF BOREHOLE AND WELLHEAD EQUIPMENT LAYOUT FOR WELL SURVEY ENVISAGING INJECTION OF INJECTION FLUID TO FORMATION AND EXTRACTION OF FLUIDS FROM FORMATION Russian patent published in 2014 - IPC E21B47/00 E21B43/00 E21B33/03 

Abstract RU 2531414 C1

FIELD: oil and gas industry.

SUBSTANCE: invention suggests the method of borehole and wellhead equipment layout for well survey envisaging injection of injection fluid to the formation and extraction of fluids from the formation, which includes running in of a flow string to the well with a jet pump or a circulation valve intended for compressor operation with isolation of the flow string and annular space. At that the tubing shoe is run in up to the level of upper perforation holes or as much as closer to it. The packer is set at distance of 20 metres at most from the tubing shoe, over the packer or as close as possible to it at one of the flow string pipes one or two circulation valves or a jet pump and a mandrel below them with one or two remote (permanent) pressure and temperature quartz sensors for tubular and annular space. The well head is equipped with a packaging arrangement consisting of a lubricator, two wellhead pressure and temperature sensors to control buffer and annular parameters, a choke chamber with an adjustable choke, a multiphase flow meter, a sampler allowing oil, water and gas sampling in conditions of the well operation, a discharge unit comprising two angled bends and two choke chambers. Connection of a feeder is envisaged for pumping of injection fluid or delivery of working agent from a tank to the buffer line or annular space. The line from the feeder is equipped with a branch pipe via the choke chamber with the adjustable choke back to the tank; a flow meter is mounted in the line from the feeder to the well downstream the branch line in order to control volume of the fluid fed to the well. In order to increase reliability of pressure and temperature measurement one or two self-contained or remote pressure and temperature sensors are mounted under the packer. In order to increase accuracy of phase debit measurement in the formation flow at the flow string over the packer or below it a downhole multiphase flow meter is mounted with functions of continuous monitoring of phase consumption as well as function of downhole pressure and temperature measurement.

EFFECT: for the purpose of direct and back circulation in the well bore a direct and return circulation valves are included into composition of the downhole assembly.

4 cl, 2 dwg

Similar patents RU2531414C1

Title Year Author Number
METHOD AND DEVICE FOR FORMATION GEOMECHANICAL IMPACT 2018
  • Zakirov Sumbat Nabievich
  • Zakirov Ernest Sumbatovich
  • Indrupskij Ilya Mikhajlovich
  • Anikeev Daniil Pavlovich
  • Baganova Marina Nikolaevna
  • Drozdov Aleksandr Nikolaevich
  • Drozdov Nikolaj Aleksandrovich
RU2680563C1
METHOD FOR SELECTIVE ANALYSIS OF SEPARATE FORMATIONS OF COAL-METHANOL WELLS 2015
  • Zolotykh Stanislav Stanislavovich
  • Gergert Viktor Vladimirovich
  • Almukhametov Artur Vinerovich
  • Akulin Roman Sergeevich
RU2578143C1
METHOD FOR CONCURRENT-SEPARATE OPERATION OF SEVERAL BEDS VIA ONE FORCE WELL IN TURNS 2003
  • Sharifov Makhir Zafar Ogly
  • Leonov V.A.
  • Kudrjashov S.I.
  • Shashel' V.A.
  • Khamrakulov A.A.
  • Garipov O.M.
  • Prytkov D.V.
RU2253009C1
METHOD OF FORMATION GEOMECHANICAL IMPACT 2018
  • Zakirov Sumbat Nabievich
  • Zakirov Ernest Sumbatovich
  • Indrupskij Ilya Mikhajlovich
  • Anikeev Daniil Pavlovich
  • Klimov Dmitrij Sergeevich
  • Drozdov Aleksandr Nikolaevich
  • Drozdov Nikolaj Aleksandrovich
  • Spesivtsev Yurij Nikolaevich
RU2680158C1
BOREHOLE PLANT FOR SIMULTANEOUS SEPARATE AND ALTERNATE OPERATION OF SEVERAL FORMATIONS BY SINGLE WELL 2003
  • Sharifov Makhir Zafar Ogly
  • Leonov V.A.
  • Uzhakov V.V.
  • Krasnoperov V.T.
  • Kuznetsov N.N.
  • Garipov O.M.
  • Gurbanov Sejfulla Ramiz Ogly
  • Nabiev Natig Adil Ogly
  • Nabiev Fizuli Ashraf Ogly
  • Sineva Ju.N.
  • Jusupov R.F.
RU2262586C2
METHOD OF DEVELOPMENT AND EXPLORATION OF WELLS AND OF INTENSIFYING OF OIL-GAS INFLUX OF HEAVY HIGH VISCOUS OILS AND FACILITY FOR IMPLEMENTATION OF THIS METHOD 2007
  • Shlein Gennadij Andreevich
  • Kuznetsov Jurij Alekseevich
  • Kotov Taras Aleksandrovich
RU2340769C1
METHOD OF DIB HOLE PREPARATION FOR HYDRAULIC FRACTURING 2016
  • Ksenofontov Denis Valentinovich
  • Novikov Igor Mikhajlovich
  • Tabashnikov Roman Alekseevich
  • Minapov Ravil Ramilevich
  • Sabanov Aleksej Vasilevich
  • Adylgareev Irek Nagimovich
RU2622961C1
METHOD OF HYDRODYNAMIC ACTION ON BOTTOM-HOLE FORMATION ZONE 2011
  • Kamalov Rustehm Naifovich
  • Lysenkov Aleksandr Petrovich
  • Zhdanov Vladimir Igorevich
  • Sulejmanov Gaziz Agzamovich
  • Nigmatzjanova Lilija Ruffetovna
  • Belobokova Ol'Ga Sergeevna
RU2483200C1
METHOD OF CONTROLLED INJECTION OF LIQUID THROUGH FORMATION (VERSIONS) 2016
  • Nagumanov Marat Mirsatovich
  • Shamilov Faat Takhirovich
  • Salakhov Ruslan Olikovich
  • Lubyshev Daniil Petrovich
  • Basharov Rustam Fanurovich
RU2634317C1
METHOD AND ARRANGEMENT FOR CONTROLLED INJECTION OF LIQUID THROUGH FORMATIONS 2017
  • Sulejmanov Ildar Amirovich
  • Gabdullin Bayazit Fazitovich
  • Khusainov Albert Railevich
RU2636842C1

RU 2 531 414 C1

Authors

Vasil'Ev Ivan Vladimirovich

Indrupskij Il'Ja Mikhajlovich

Zakirov Ehrnest Sumbatovich

Anikeev Daniil Pavlovich

Dates

2014-10-20Published

2013-05-30Filed