FIELD: construction.
SUBSTANCE: method of formation of mole drains involves cutting in the soil thickness 1 along the drainage route of W-shaped slot 2, enclosing the drain 3 along the sides and from bottom, forming drain cavities 3 with compaction of its walls with the vertical center part of the slot 2 goes to the drain 3 from below. The drain cavity 3 in cross section is formed as Reuleaux triangle, where one of the corners of Reuleaux triangle is located in the upper part of the dome part 4 of the drain cavity 3.
EFFECT: increased stability of the dome and walls of mole drains.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MAKING MOLE DRAINS | 0 |
|
SU1634751A1 |
OPERATING ELEMENT OF MOLE DRAIN MACHINE | 2015 |
|
RU2611800C1 |
MOLE DRAINAGE DEVICE | 2015 |
|
RU2611787C1 |
WORKING ELEMENT OF MOLE PLOW | 2015 |
|
RU2614380C1 |
WORKING MEMBER FOR DRIVING MOLE-HOLE DRAINS | 0 |
|
SU1016441A1 |
WORKING MEMBER FOR TILLING EARTH FOR LAYING OF STRAWBERRY PLANTATION | 1997 |
|
RU2123085C1 |
DRAINAGE MOLE FOR CUTTING INCLINED DRAINS | 0 |
|
SU1222752A1 |
MOLE PLOW | 2002 |
|
RU2237777C2 |
WORKING MEMBER OF MOLL-TYPE DRAINAGE MACHINE | 0 |
|
SU698565A1 |
APPARATUS FOR CONSTRUCTING HORIZONTAL GROUND DRAINAGE | 0 |
|
SU1386699A1 |
Authors
Dates
2017-03-03—Published
2015-11-24—Filed