FIELD: agriculture.
SUBSTANCE: before starting, perforated metal-plastic tube connected to the steam boiler is placed serpentinely on the compacted soil lot and covered with film. The lot is steamed to a depth of 20÷25 cm. After steaming the perforated metal-plastic tube with a film is removed and transferred to the next lot. The steamed lot is loosened in fragments using lever-type Lamerdonov shovels by lowering fragments of soil down into place. The working elements are extracted from the soil using pullback spring of shovels and moved to the next working position within the steamed lot by operators. The operation is repeated again after loosening of the steamed lot.
EFFECT: method enables to increase the efficiency of work perfomance during loosening of the compacted soil.
2 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF LOOSENING PLANTED SOIL | 2014 |
|
RU2571036C1 |
DEVICE FOR DIGGING AND LOOSENING ANY TYPES OF SOIL | 2014 |
|
RU2572562C2 |
LEVER CULTIVATOR OF COMPACTED SOILS | 2017 |
|
RU2674614C1 |
METHOD FOR LOOSENING OF COMPACTED SOIL TO A GREATER DEPTH USING AN IMPACT LEVER RIPPER | 2018 |
|
RU2706472C1 |
DEVICE FOR POTATO DIGGING OUT | 2014 |
|
RU2551529C1 |
METHOD OF DIGGING-OUT POTATOES | 2014 |
|
RU2575040C2 |
DEVICE FOR DIGGING POTATOES | 2013 |
|
RU2525928C1 |
METHOD TO ERECT TILED FIXATION | 2011 |
|
RU2471920C1 |
DEVICE FOR STREETS SWEEPING AND SNOW REMOVAL | 2014 |
|
RU2576172C1 |
LEVER SHOVEL FOR DIGGING AND LOOSENING HEAVY SOILS | 2016 |
|
RU2628790C2 |
Authors
Dates
2017-03-09—Published
2016-01-11—Filed