MINING METHOD FOR MULTI-LAYERED INHOMOGENEOUS OIL RESERVOIR Russian patent published in 2017 - IPC E21B43/18 E21B43/14 E21B43/267 

Abstract RU 2626492 C1

FIELD: mining engineering.

SUBSTANCE: method includes drilling of vertical injection wells and of a production well with a horizontal wellbore, identification of pay formations with different permeability separated by impermeable interlayers, fastening casing strings and their perforation, injection of displacement fluid and recovery of well products. One horizontal wellbore is drilled in the pay formation located in the middle of the oil reservoir perpendicular to the direction of the main stress σmax. Then two vertical wellbores are drilled in the horizontal wellbore on the right and left side, drilling in all pay formations. The permeability of each pay formation is determined. The horizontal wellbore of the production well and the vertical wellbores of the injection wells are lined with casing strings. The perforation is done in vertical injection wells opposite each pay formation, and the perforation in the horizontal wellbore of the production well is done depending on the number of pay formations, perforated by the injection wells. Next, in each interval of perforation of the horizontal wellbore of the production well, interval hydraulic fractures are produced with the formation of fractures and their subsequent fixation by a proppant of a fraction corresponding to the permeability of each pay formation. To make a hydraulic fracture, a fracturing fluid with light proppant is injected into the lower pay formation. In order to make a hydraulic fracture within the pay formation where the horizontal wellbore is drilled, a fracturing fluid is injected without proppant. And in order to make a hydraulic fracture in the upper pay formation, a fracturing fluid is injected with a heavy proppant. To maintain hydraulic fractures, a carrying fluid with a 12/18 mesh proppant is pumped into a pay formation with a permeability of 0.01 to 40 mD, and a carrying fluid with a 20/40 mesh proppant is pumped into a pay formation with a permeability of 40 to 100 mD. A carrying fluid with a 40/80 mesh proppant is pumped into a pay formation with a permeability of 100 to 500 mD. Then, a pump is lowered into the horizontal wellbore of the production well, a displacement fluid is pumped through vertical injection wells into pay formations, the pump is started and the products are taken from the horizontal wellbore of the production well.

EFFECT: improved reliability of the method implementation.

3 dwg

Similar patents RU2626492C1

Title Year Author Number
DEVELOPMENT METHOD OF MULTILAYER OIL DEPOSIT USING HYDRAULIC FRACTURING OF FORMATION 2012
  • Nasybullin Arslan Valer'Evich
  • Salimov Vjacheslav Gajnanovich
  • Salimov Oleg Vjacheslavovich
RU2513791C1
METHOD OF OPERATION OF PRODUCTION AND WATER-BEARING FORMATIONS SEPARATED BY IMPERMEABLE INTERLAYER, WELL WITH HORIZONTAL SHAFTS AND CRACKS OF FORMATION HYDRAULIC FRACTURING 2016
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
  • Girfanov Ildar Ilyasovich
RU2630514C1
HIGH-VISCOSITY OIL OR BITUMEN RECOVERY METHOD, USING HYDRAULIC FRACTURES 2016
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
  • Girfanov Ildar Ilyasovich
RU2626845C1
METHOD OF HYDRAULIC FRACTURING OF FORMATION IN CONDITIONS OF HIGH-DISSECTED HIGH-CONDUCTIVITY RESERVOIR WITH LOW STRESS CONTRAST OF BRIDGES 2019
  • Petrov Semen Aleksandrovich
  • Pavlov Valerij Anatolevich
  • Pavlyukov Nikolaj Alekseevich
  • Lapin Konstantin Georgievich
  • Melikov Ruslan Fuadovich
RU2737455C1
DEVELOPMENT METHOD OF MASSIVE OIL DEPOSIT USING HYDRAULIC FRACTURING OF FORMATION 2014
  • Ibatullin Ravil' Rustamovich
  • Nasybullin Arslan Valer'Evich
  • Salimov Oleg Vjacheslavovich
  • Salimov Vjacheslav Gajnanovich
  • Zijatdinov Radik Zjauzjatovich
RU2560022C1
DEVELOPMENT METHOD OF MULTILAYER NON-HOMOGENEOUS OIL DEPOSIT 2011
  • Khisamov Rais Salikhovich
  • Zaripov Azat Timer'Janovich
  • Asadullin Marat Fagimovich
  • Zaripova Lejlja Razilevna
  • Zijatdinov Radik Zjauzjatovich
RU2459934C1
RECOVERY METHOD OF HIGH-VISCOSITY OIL DEPOSIT BY STEAM CYCLIC EFFECT 2016
  • Zaripov Azat Timeryanovich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
  • Girfanov Ildar Ilyasovich
RU2633930C1
METHOD FOR IMPROVEMENT OF HYDRODYNAMIC COMMUNICATION OF WELL WITH PRODUCTIVE FORMATION 2011
  • Fajzullin Ilfat Nagimovich
  • Khurrjamov Al'Fis Mansurovich
  • Khurrjamov Bulat Al'Fisovich
  • Ramazanov Rashit Gaznavievich
  • Zijatdinov Radik Zjauzjatovich
  • Sulejmanov Farid Bashirovich
RU2485296C1
METHOD OF PRODUCTIVE FORMATION HYDRAULIC FRACTURING WITH CLAY LAYER AND GAS-BEARING HORIZON 2016
  • Nasybullin Arslan Valerevich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
RU2613689C1
METHOD FOR DEVELOPMENT OF MULTI-HORIZON NON-UNIFORM OIL FIELDS BY MEANS OF BRANCHED HORIZONTAL WELLS 2007
  • Abdulmazitov Rafil' Ginijatullovich
  • Ramazanov Rashit Gaznavievich
  • Jamgutdinov Marat Rifovich
  • Musin Renat Akhtjamovich
  • Timergaleeva Ramzija Rinatovna
RU2339801C2

RU 2 626 492 C1

Authors

Nasybullin Arslan Valerevich

Salimov Oleg Vyacheslavovich

Ziyatdinov Radik Zyauzyatovich

Dates

2017-07-28Published

2016-04-26Filed