FIELD: oil and gas industry.
SUBSTANCE: method includes boring of pressure and producing wells with vertical and horizontal and/or sub-horizontal bores of horizontal and/or sub-horizontal and/or vertical branches, then pumping of displacing fluid and withdrawal of well product. According to the invention while boring horizontal and/or sub-horizontal bores borders of zones with different permeability crossed by these bores are determined. The number of branches is specified in direct proportion dependence on oil resources, in inverse proportion on zones permeability and on the condition of uniform extraction of deposit resources. Further a packer is installed in horizontal and/or sub-horizontal wells at the border of zones differed in their permeability by 1.5 and more times. Withdrawal of product is performed maintaining bottom pressure for each chosen zone.
EFFECT: increased oil extraction due to increased coverage of non-uniform beds by effecting onto them and due to uniformity of oil resources withdrawal.
1 ex, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT METHOD OF OIL DEPOSIT WITH LAYER-BY-LAYER HETEROGENEITY | 2010 |
|
RU2443855C1 |
METHOD FOR DEVELOPMENT OF MULTILAYER OIL RESERVOIR | 2015 |
|
RU2583471C1 |
METHOD FOR DEVELOPMENT OF LAMINAR CARBONATE OIL DEPOSIT | 2015 |
|
RU2599646C1 |
DEVELOPMENT METHOD OF MULTILAYER NON-HOMOGENEOUS OIL DEPOSIT | 2011 |
|
RU2459934C1 |
METHOD OF DEVELOPMENT OF MULTILAYER OIL DEPOSITS | 2015 |
|
RU2584190C1 |
DEVELOPMENT METHOD OF MULTILAYER NON-HOMOGENEOUS OIL DEPOSIT | 2014 |
|
RU2567918C1 |
MULTI ZONE OIL RESERVOIR AT LATE STAGE WITH UNSTABLE COVER FORMATION AND NON-HOMOGENEOUS COLLECTOR DEVELOPMENT METHOD | 2008 |
|
RU2382183C1 |
MINING METHOD FOR MULTI-LAYERED INHOMOGENEOUS OIL RESERVOIR | 2016 |
|
RU2626492C1 |
DEVELOPMENT METHOD FOR STACKED OIL POOL HAVING WATER-OIL ZONES AND/OR MASSIVE POOL | 2004 |
|
RU2282022C2 |
MULTI-FORMATION OIL DEPOSIT DEVELOPMENT METHOD | 2011 |
|
RU2459069C1 |
Authors
Dates
2008-11-27—Published
2007-01-12—Filed