FIELD: oil and gas industry.
SUBSTANCE: method used to identify at least two reservoirs which coincide on a plan and separated by interlayers-bridges. Drilling of vertical injection wells and branched horizontal production well is perfomed with horizontal shafts of required length located in the corresponding reservoir. The displacement fluid is injected through vertical injection wells and products are taken through branched horizontal production well. Actual reserves, oil viscosity and permeability for each reservoir in the development area are determined. The horizontal shafts are constructed with length directly proportional to the reserves of the corresponding reservoir being opened. The injection wells are opened by perforation of all the reservoirs. The perforation area for the respective reservoir is selected in direct proportion to the product viscosity and/or the thickness of the reservoir section. Production of oil reserves of all reservoirs with one pumping equipment of branched production well is carried out. When the operating mode of the branched production and injection wells is established, constant supervision over watering of oil being produced is performed. When watering of produced oil is 80-90%, the reservoir with the maximum watering value is determined by oil viscosity and cut from the main shaft of the production well.
EFFECT: improving efficiency of the process by providing uniform production of two or more formations and reducing drilling costs.
1 ex, 1 tbl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPMENT OF MULTILAYER OIL DEPOSITS | 2015 |
|
RU2584190C1 |
METHOD FOR DEVELOPMENT OF LAMINAR CARBONATE OIL DEPOSIT | 2015 |
|
RU2599646C1 |
METHOD FOR DEVELOPMENT OF MULTILAYER OIL RESERVOIR | 2015 |
|
RU2583471C1 |
METHOD OF DEVELOPMENT OF OIL POOLS OBSTRUCTED BY EROSION TRENCH | 2007 |
|
RU2334087C1 |
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT IN CARBONATE COLLECTORS COMPLICATED WITH EROSION CUT | 2010 |
|
RU2434124C1 |
RECOVERY METHOD OF OIL DEPOSIT IN CARBONATE RESERVOIRS, COMPLICATED BY THE EROSIVE CHANNEL | 2016 |
|
RU2626483C1 |
METHOD FOR OIL DEPOSIT IN CARBONATE RESERVOIRS COMPLICATED BY EROSIVE CHANNEL | 2016 |
|
RU2630324C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSITS COMPLICATED WITH VISEAN EROSIONAL DOWNCUTS | 2005 |
|
RU2298087C1 |
METHOD OF OIL DEPOSIT DEVELOPMENT | 2011 |
|
RU2439299C1 |
DEVELOPMENT METHOD OF MULTILAYER NON-HOMOGENEOUS OIL DEPOSIT | 2011 |
|
RU2459934C1 |
Authors
Dates
2017-09-07—Published
2016-08-23—Filed