FIELD: mining.
SUBSTANCE: method involves oil-bearing pool contour amendment and defining oil saturation thickness of reservoir rock in erosion trench, drilling production and injection wells, well product withdrawal and working agent injection to the stratum. According to the invention, a branched horizontal production well is drilled in highly permeable trench zone with branches reaching outside the trench to the low-permeable Tournaisian zone at the distance not exceeding two thirds of one branch length. The branches are positioned at one horizontal plane with ascending or descending main horizontal hole, and are perpendicular to the extrusion flow of working agent from vertical or tilted injection wells.
EFFECT: increased oil withdrawal due to reduction of well number and investment into drilling.
1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT IN CARBONATE COLLECTORS COMPLICATED WITH EROSION CUT | 2010 |
|
RU2434124C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSITS COMPLICATED WITH VISEAN EROSIONAL DOWNCUTS | 2005 |
|
RU2298087C1 |
RESERVOIR MANAGEMENT TECHNIQUE | 2010 |
|
RU2441978C1 |
DEVELOPMENT METHOD OF PRODUCTIVE FORMATION WITH LOW-PERMEABILITY SECTION | 2012 |
|
RU2485295C1 |
RECOVERY METHOD OF OIL DEPOSIT IN CARBONATE RESERVOIRS, COMPLICATED BY THE EROSIVE CHANNEL | 2016 |
|
RU2626483C1 |
DEVELOPMENT METHOD OF PRODUCTIVE FORMATION WITH LOW-PERMEABILITY SECTION | 2012 |
|
RU2485291C1 |
METHOD FOR OIL DEPOSIT IN CARBONATE RESERVOIRS COMPLICATED BY EROSIVE CHANNEL | 2016 |
|
RU2630324C1 |
MULTI-SITE OIL DEPOSIT DEVELOPMENT METHOD | 2011 |
|
RU2459935C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2005 |
|
RU2285795C1 |
MULTIPAY OIL DEPOSIT DEVELOPMENT METHOD | 2013 |
|
RU2530005C1 |
Authors
Dates
2008-09-20—Published
2007-01-26—Filed