FIELD: construction.
SUBSTANCE: method of manufacturing a monolithic reinforced concrete cellular floor with the use of permanent formwork for monolithic house building, which comprises a prefabricated profiled flooring and modular elements, consists in the fact that the modular elements are made in the form of caissons, column capitals, beams, girders and bolts of fiberglass concrete of various configurations, on the visible surface of which decorative patterns (reliefs) are applied. Wherein their size and configuration are calculated in advance, taking into account the number and pitch of the columns, the ceiling height and the room destination; then they are installed on a monolithic horizon. In the space formed by vertical ribs of the modular elements, reinforcing cage is laid, and the modular elements are interconnected by means of embedded and surface-mounted parts. Then concrete mixture is laid.
EFFECT: creating a cellular floor in the form of permanent formwork, which is more economical in terms of concrete and steel consumption, while reducing the material consumption of vertical bearing structures and foundations due to reducing the total weight.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF MONOLITHIC STRUCTURES OF BUILDINGS AND NON-REMOVABLE UNIVERSAL MODULAR FORMWORK SYSTEM | 2014 |
|
RU2552506C1 |
METHOD OF FACING FACADE OF FLOORS IN MONOLITHIC CONSTRUCTION OF BUILDINGS | 2015 |
|
RU2632617C2 |
PERMANENT FORMWORK OF MONOLITH FLOOR | 2014 |
|
RU2561127C1 |
METHOD OF FACADE ALIGNMENT IN MONOLITHIC HOUSING CONSTRUCTION | 2018 |
|
RU2696737C1 |
FIXED FORMWORK SYSTEM FOR LARGE-BLOCK CONSTRUCTION OF BUILDINGS | 2019 |
|
RU2720548C1 |
METHOD OF ERECTING LARGE-SPAN CEILINGS AND COATINGS | 2020 |
|
RU2734511C1 |
CONSTRUCTION METHOD | 2019 |
|
RU2706288C1 |
NUCLEAR POWER PLANT | 2021 |
|
RU2767308C1 |
METHOD FOR LEVELLING FACADE IN MONOLITHIC HOUSEBUILDING | 2016 |
|
RU2632614C2 |
METHOD FOR DETERMINING THE FIRE RESISTANCE OF A MONOLITHIC STEEL-REINFORCED CONCRETE FLOOR SLAB OF A BUILDING | 2022 |
|
RU2795798C1 |
Authors
Dates
2017-10-24—Published
2016-02-09—Filed