FIELD: mining engineering.
SUBSTANCE: steep incline conveyor unit (1) contains a route (14) fixed on an inclined slope (10) of an open working. A first and a second lifting cages (15, 16) are movable along the route (14) between the lower level (12) and the upper level (13). The lifting cages (15, 16) are connected together by a common traction device (17). In the region of the lower level (12) of the route (14), there is a loading device (18) provided for filling the lifting cages (15, 16) with minerals (11) through a loading opening (21) from vehicles (19). The lifting cages (15, 16) comprise an discharge opening (23) located below the loading opening (21). It is possible to unload the minerals (11) from the lifting cages (15, 16) without changing their position through the discharge opening.
EFFECT: possibility to load cages with transported mass equal to the load of the feeding vehicle.
16 cl, 13 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OPEN EXTRACTION OF MINERAL RESOURCES DEPOSITS | 2003 |
|
RU2249698C1 |
CONVEYOR PLANT FOR OPEN DEVELOPMENT | 2016 |
|
RU2696894C2 |
OPEN DEVELOPMENT OF STEEP ORE BODIES | 2014 |
|
RU2571776C1 |
SELF-CLEANING STEEPLY INCLINED BELT CONVEYOR | 2005 |
|
RU2279393C1 |
METHOD OF OPEN EXCAVATING OF MINERAL DEPOSITS | 2007 |
|
RU2353771C2 |
SURFACE MINERAL MINING METHOD AND DEVICE | 2005 |
|
RU2310754C2 |
PROCEDURE FOR OPEN PIT DEVELOPMENT OF MINERAL DEPOSITS | 2009 |
|
RU2394158C1 |
HIGH-ANGLE BELT CONVEYOR | 0 |
|
SU1819836A1 |
HIGH-ANGLE BELT CONVEYOR FOR LUMPY CARGO | 2014 |
|
RU2613469C2 |
ABRUPTLY INCLINED BAND CONVEYER | 0 |
|
SU1726324A1 |
Authors
Dates
2017-11-24—Published
2013-01-30—Filed