FIELD: construction.
SUBSTANCE: method for compacting bases formed by weak mineral soils includes making a well, filling a compacting material into the well, and creating the compacting impact by a hollow tubular working tool on the compacting material to form a compacting column. Preliminarily, engineering geological survey of the base soil is carried out, and the values of the strain modulus, the Poisson's ratio, the angle of internal friction, the specific cohesion, the specific gravity, the initial porosity coefficient of the weak mineral soil are determined. Then, the effective value of the strain modulus εi at expanding the compacting material in the well is calculated by the initial and specified porosity coefficient of the weak mineral soil according to the given dependence. Thereinafter the column spacing pitch is defined by the selection method in a range from one to three diameters of the columns, which gives the value of the design base deformation modulus, the necessary increase of the well radius in the process of indentation is calculated by the given dependencies. The well is made by means of indenting a tool in the base soil, filling the compacting material into the well is carried out through the working tool cavity, and the compacting impact for forming a compacting column is carried out by indenting the working tool into the compacting material. Additional engineering and geological survey are carried out on the site, the deformation modulus of the compacted soil between the columns, and the actual average deformation modulus of the base as a whole is calculated according to the given dependence. Then it is compared with the design one, and if the actual average base deformation modulus does not correspond to its design value, additional columns are installed between previously installed ones.
EFFECT: increasing soil compaction productivity, reducing material consumption and labour intensity.
5 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SEALING THE BASES BROKEN BY WEAK MINERAL SOILS | 2017 |
|
RU2662841C1 |
METHOD TO TEST SOILS FOR COMPRESSIBILITY WITH STATIC LOADS AND DEVICE FOR ITS REALISATION | 2008 |
|
RU2419706C2 |
METHOD OF DETERMINING STRAIN CHARACTERISTICS OF WEAK SATURATED SOILS | 0 |
|
SU1357495A1 |
METHOD AND DEVICE FOR GROUND TESTS WITH STAMP | 1991 |
|
RU2014386C1 |
METHOD FOR ERECTION OF MONOLITHIC FOUNDATION FOR NUCLEAR POWER PLANT AND ARRANGEMENT OF NUCLEAR POWER PLANT FOUNDATION | 2008 |
|
RU2390610C2 |
METHOD FOR ERECTION OF SUBGRADE OF CLUSTER PAD WITH GEOTEXTILE CAGES | 2023 |
|
RU2824540C1 |
METHOD FOR CORRECTION OF VERTICAL POSITION OF BUILDINGS AND STRUCTURES ON PANEL-WALL FOUNDATION | 2007 |
|
RU2352723C1 |
METHOD FOR MANUFACTURING OF FOUNDATION FROM BORING PILES | 2009 |
|
RU2403341C1 |
METHOD OF DETERMINING DEFORMATION MODULUS OF WEAK WATER-SATURATED SOILS | 0 |
|
SU685760A1 |
METHOD FOR DETERMINING GROUND FILTRATION COEFFICIENT | 0 |
|
SU1661627A1 |
Authors
Dates
2018-01-10—Published
2016-08-04—Filed