FIELD: oil and gas industry.
SUBSTANCE: method of remedial cementing operations in wells includes preparing and injecting water-insulating composition into the well, containing, wt %: acetone-formaldehyde resin - 20.0-40.0, alkali drain of caprolactam production - 45.0-60.0 and 10% sodium hydroxide solution - 15-20.0. To prepare the water-insulating composition, alkali drain of caprolactam production is mixed with 10% sodium hydroxide solution and added with stirring to acetone-formaldehyde resin. The produced water-insulating composition is pumped into the well, after which it is left for gelling for 24-48 hours.
EFFECT: improved efficiency of the method of remedial cementing operations by increasing the radius of water-insulating screen and increasing the coverage of action, extended time interval for gel formation, and reduced duration and labour intensity of operations.
1 tbl, 3 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR REPAIR AND INSULATION WORKS IN WELL | 2016 |
|
RU2650001C1 |
COMPOSITION FOR MAINTENANCE AND ISOLATION OPERATIONS IN WELLS | 2003 |
|
RU2250983C1 |
METHOD OF SHUT-OFF AND RESTRAINT OF WATER PRODUCTION IN WELLS | 2007 |
|
RU2349731C2 |
DEVELOPMENT METHOD OF CARBONATE OIL FORMATION (OPTIONS) | 2016 |
|
RU2618547C1 |
PROCEDURE FOR RECOVERY OF TIGHTNESS IN FLOW STRING AND ELIMINATION OF BEHIND-CASING FLOWS | 2013 |
|
RU2518620C1 |
METHOD FOR REPAIR AND INSULATION WORKS IN WELL | 2015 |
|
RU2601888C1 |
BACKFILLING COMPOSITION FOR SEALING INFLUX OF WATER INTO WELL | 2015 |
|
RU2586946C1 |
METHOD TO INSULATE ABSORPTION ZONE IN WELL | 2010 |
|
RU2447258C1 |
METHOD OF PRODUCTION STRING SEALING | 2013 |
|
RU2520217C1 |
ISOLATION METHOD OF WATER INFLUXES TO WELL (VARIANTS) | 2017 |
|
RU2667241C1 |
Authors
Dates
2018-01-12—Published
2017-01-09—Filed