FIELD: construction.
SUBSTANCE: method of manufacturing piles with a widened heel includes forming a well, widening it at the bottom and filling the formed cavity with concrete. Said well widening is carried out by feeding a gas-forming fluid into the bottom well part at the widening height, by means of which the soil is weakened, bringing it to the state of gas-water pulp, which is removed.
EFFECT: increasing the efficiency and reliability of the pile manufacturing, reducing the material and labour consumption of erecting a pile with a widening.
3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF TRENCHLESS LAYING OF PIPELINES IN SOIL | 2019 |
|
RU2698934C1 |
METHOD AND DEVICE FOR CAST-IN-PLACE PILE FORMING | 2002 |
|
RU2236506C2 |
METHOD OF MAKING CAST-IN-PLACE PILES WITH ROOT-LIKE MEMBERS AND DEVICE FOR ITS EMBODIMENT | 1998 |
|
RU2163279C2 |
REINFORCEMENT METHOD OF FOUNDATION BASE DURING RECONSTRUCTION OF BUILDINGS AND STRUCTURES | 2019 |
|
RU2708929C1 |
METHOD OF CONSTRACTING A CAST-IN-PLACE PILE | 0 |
|
SU996626A1 |
METHOD FOR PRODUCING CAST-IN-PLACE PILES | 1993 |
|
RU2039156C1 |
METHOD OF MANUFACTURING REINFORCED CAST-IN-PLACE PILE | 0 |
|
SU1677180A1 |
METHOD AND DEVICE FOR MOULDING OF CAST-IN- PLACE PILE IN GROUND | 1997 |
|
RU2150549C1 |
MANUFACTURING METHOD OF ASSEMBLY ATTACHING PILE TO AVAILABLE FOUNDATION AT ITS BEING REINFORCED (VERSIONS) | 2008 |
|
RU2385384C1 |
METHOD OF PILE FORMING IN PRELIMINARY FORMED WELL | 2002 |
|
RU2231596C2 |
Authors
Dates
2018-01-19—Published
2017-03-07—Filed