MANUFACTURING METHOD OF ASSEMBLY ATTACHING PILE TO AVAILABLE FOUNDATION AT ITS BEING REINFORCED (VERSIONS) Russian patent published in 2010 - IPC E02D27/08 E02D5/34 

Abstract RU 2385384 C1

FIELD: construction.

SUBSTANCE: at least two holes are drilled in foundation or in plate of reinforced concrete raft. One hole is made coaxially relative to longitudinal axis of the formed reinforcement pile. Other holes are drilled in the form of hollows at some angle to it. Drilling of all holes is started within the outline of head of pile, thus extending them beyond the pile head as the holes inclined relative to the pile are deepened. First, there made are holes oriented at an angle to pile axis, thus leaving bore cores non-removed. After that a through hole coaxial to the pile and through which the pile is formed is drilled. Bore cores are removed, wells of holes are ground, pile and formed assembly is reinforced, and it is concreted. As per the second version, in manufacturing method of the assembly attaching the pile to available foundation there drilled in foundation is through hole coaxial to longitudinal axis of reinforcement pile and through which a well with local widening in contact zone with foundation shoe is formed. Widening is made with energy of electric discharges in concrete mixture. Processing with discharges is performed till concrete mixture level is decreased by the value not less than well diametre value. The third version of method's implementation provides drilling with design pitch of holes, the diametre of which is chosen from condition when reinforcing rods are submerged in them. Holes are deepened under the plate to the soil by depth of anchorage of reinforcement. Holes are filled with hardening material. Reinforcing rods are equipped with centralisers and put into holes.

EFFECT: improving reliability of assembly attaching the pile to available foundation during reconstruction of the building and reinforcement of foundations.

11 cl, 2 dwg

Similar patents RU2385384C1

Title Year Author Number
REINFORCEMENT OF VERTICAL PILES MADE IN SOIL AND PERCEIVING INDENTATION LOADS 2010
  • Eremin Valerij Jakovlevich
  • Eremin Aleksej Valer'Evich
  • Madatjan Sergej Ashotovich
  • Molchanov Kirill Dmitrievich
RU2465403C2
INJECTION PILE AND RETAINING WALL BUILT OF PILE FOUNDATION 2004
  • Vasjukevich Leonid Jul'Evich
  • Stotsenko Aleksej Aleksandrovich
RU2281997C2
CORRECTION METHOD OF INCLINATION AND NON-UNIFORM SETTLEMENT OF LARGE HIGH-RISE STRUCTURE AND ITS FOUNDATION 2010
  • Dmitrienko Aleksej Gennadievich
  • Glukhov Vjacheslav Sergeevich
  • Shirmanov Aleksandr Aleksandrovich
  • Suchkov Sergej Aleksandrovich
  • Murakaev Il'Nur Marsovich
RU2436899C1
METHOD OF RAFT FOUNDATIONS REINFORCEMENT 2015
  • Polishshuk Anatolij Ivanovich
  • Chesnokov Denis Aleksandrovich
RU2592314C1
METHOD FOR ERECTION OF SLAB-PILE FOUNDATION 2008
  • Shadunts Konstantin Shagenovich
  • Marinichev Maksim Borisovich
RU2378454C1
METHOD FOR BUILDING AND BUILDING STRUCTURE ERECTION, RENEWAL AND RECONSTRUCTION 2005
  • Selivanov Nikolaj Pavlovich
  • Shembakov Vladimir Aleksandrovich
RU2285771C1
PIPE CONCRETE PILE WITH REINFORCED BASE AND METHOD OF ITS ERECTION 2011
  • Akatov Vjacheslav Pavlovich
  • Akatov Maksim Vjacheslavovich
  • Dankovtsev Aleksandr Fedorovich
  • Pudeev Pavel Vasil'Evich
  • Smirnov Aleksandr Jur'Evich
  • Politiko Dmitrij Leonidovich
  • Fedorashko Nikolaj Vasil'Evich
RU2492294C1
METHOD OF PILE PRODUCTION BY IMPRESSION 2013
  • Striganov Jurij Pavlovich
  • Striganov Ivan Jur'Evich
  • Striganov Mikhail Jur'Evich
RU2554368C2
POLE FOR OVERHEAD SYSTEM TO BE ERECTED IN HEAVING GROUND 2006
  • Abzhalimov Rais Shakirovich
RU2317375C2
REINFORCED CONCRETE DRILLING PILE AND METHOD OF ITS ERECTION 2016
  • Yurkevich Pavel Borisovich
RU2657885C2

RU 2 385 384 C1

Authors

Eremin Valerij Jakovlevich

Budanov Aleksej Aleksandrovich

Eremin Aleksej Valer'Evich

Rajanov Sergej Fadusovich

Siguta Jurij Vasil'Evich

Tikhonov Mikhail Sergeevich

Dates

2010-03-27Published

2008-07-18Filed