THERMAL SYSTEM OF GAS-COOLED REACTOR OF NUCLEAR POWER PLANT Russian patent published in 2018 - IPC G21C15/00 

Abstract RU 2643510 C1

FIELD: power industry.

SUBSTANCE: heat system includes a gas turbine and steam turbine heat recovery cycle, using helium as the working fluid of the gas turbine cycle and steam as the working fluid of the steam turbine cycle. The gas turbine cycle comprises a gas turbine whose shaft is connected to an electric generator and a compressor, the input of the cooling system of the reactor is communicated with the compressor high pressure cavity and its outlet is communicated with the input of the gas turbine. The output of the gas turbine is communicated with the steam generating unit which comprises a first superheater, an evaporator, a second superheater and an economizer-evaporator that sequentially communicated. At that, a steam-water drum is included in the steam turbine cycle.

EFFECT: increased efficiency of the nuclear power plant of combined cycle, significant reduction of weight and dimensions of heat exchangers by applying the steam turbine cycle that contains the turbine of high and low pressure, and steam intermediate reheat.

1 dwg

Similar patents RU2643510C1

Title Year Author Number
COMBINED CYCLE GAS TURBINE WITH COOLED DIFFUSER 2019
  • Chernikov Viktor Aleksandrovich
  • Kitanin Eduard Leontevich
  • Semakina Elena Yurevna
  • Kitanina Ekaterina Eduardovna
RU2715073C1
COMBINED-CYCLE PLANT 1997
  • Vertkin M.A.
RU2144994C1
STEAM-GAS INSTALLATION 2008
  • Vertkin Mikhail Arkad'Evich
RU2391517C2
STEAM-GAS UNIT OF TWO-CIRCUIT NUCLEAR POWER PLANT 2014
  • Aminov Rashid Zarifovich
  • Egorov Aleksandr Nikolaevich
  • Kalashnikov Aleksej Andreevich
RU2547828C1
COMBINED-CYCLE PLANT WITH A STEAM TURBINE COMPRESSOR DRIVE, A REGENERATIVE AIR HEATER AND A HIGH-PRESSURE STEAM GENERATOR 2022
  • Sheludko Leonid Pavlovich
  • Pleshivtseva Yuliya Edgarovna
  • Livshits Mikhail Yurevich
RU2783424C1
THERMAL POWER PLANT 2018
  • Shaposhnikov Valentin Vasilevich
  • Biryukov Boris Vasilevich
  • Trofimenko Aleksandr Aleksandrovich
  • Batko Dmitrij Nikolaevich
RU2691881C1
COMBINED-CYCLE COGENERATION PROCESS AND COMBINED- CYCLE PLANT IMPLEMENTING IT 1999
  • Ershov V.V.
RU2166102C2
COMBINED-CYCLE GAS TURBINE ON THREE WORKING BODIES 2021
  • Kindra Vladimir Olegovich
  • Rogalev Nikolaj Dmitrievich
  • Komarov Ivan Igorevich
  • Naumov Vladimir Yurevich
  • Sklyar Nikita Sergeevich
RU2781322C1
MANOEUVRABLE COMBINED HEAT AND POWER PLANT WITH STEAM DRIVE OF COMPRESSOR 2019
  • Livshits Mikhail Yurevich
  • Sheludko Leonid Pavlovich
RU2734127C1
THERMAL POWER PLANT 2021
  • Shaposhnikov Valentin Vasilevich
  • Batko Dmitrii Nikolaevich
  • Mikhalko Iaroslav Olegovich
  • Kocharian Evgenii Valerevich
RU2776091C1

RU 2 643 510 C1

Authors

Didov Vladimir Viktorovich

Dates

2018-02-02Published

2017-04-19Filed