FIELD: construction.
SUBSTANCE: invention relates to construction, in particular to methods for constructing circular piles for transitions, through water barriers for road and railway transitions. Method of forming a pile of a shell includes immersing a tubular core and a tubular stamp to form an annular cavity filled with concrete, with the subsequent extraction under vibration of the core with simultaneous sealing of the soil plug. According to the invention, before or during the extraction of the core, a particulate material, in particular sand, is fed into the cavity of the latter filled with water.
EFFECT: method for constructing circular piles for transitions, through water barriers for road and railway transitions is proposed.
1 cl
Title | Year | Author | Number |
---|---|---|---|
TUBULAR FILLING PILE ERECTION METHOD | 1989 |
|
RU2006551C1 |
METHOD FOR ERECTING CAST-IN-PLACE SHELL PILES | 0 |
|
SU1719541A1 |
METHOD TO ERECT CAST-IN-PLACE SHELL PILES | 0 |
|
SU1719540A1 |
METHOD OF ERECTING RAMMED TUBULAR PILE, AND DEVICE THEREFOR | 0 |
|
SU1738920A1 |
CAST-IN-PLACE CASED PILE, METHOD OF SINKING PILE, AND MACHINE FOR SINKING PILE | 0 |
|
SU1634759A1 |
METHOD FOR BUILDING CAST-IN-PLACE PILE CASING | 0 |
|
SU1728368A2 |
METHOD FOR ERECTION OF SHELL PILES | 1987 |
|
RU1793752C |
APPARATUS FOR CONSTRUCTING A CAST-IN-PLACE SHELL PILE | 0 |
|
SU1481324A1 |
DEVICE FOR SINKAGE OF FILLING CASED PILE | 0 |
|
SU1726651A1 |
METHOD OF ERECTING PILE | 0 |
|
SU1786225A1 |
Authors
Dates
2018-02-20—Published
2015-10-06—Filed