FIELD: oil and gas industry.
SUBSTANCE: invention relates to the oil industry and can be used in the gaging of the production string during the current, major overhaul of wells. Gaging includes a housing, calibration elements placed on it and a coupling sleeve. In this case, the body is made hollow, calibrating elements made in the form of rings, for a suitable diameter of the production column, with technological cuts having a thickness of 5 mm or more, installed between the dampers.
EFFECT: technical result consists in increasing the efficiency of templateing the production column before the downhole of deep-well or technological equipment during the current, major repair of wells.
7 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OPERATING INJECTOR WITH MULTIPLE PACKER ASSEMBLY | 2014 |
|
RU2541982C1 |
METHOD OF OPERATION OF AN INJECTION WELL OF A SMALL DIAMETER WITH A SINGLE LIFT TWO-PACKER ARRANGEMENT | 2017 |
|
RU2678745C1 |
SET OF WORKS TO NORMALIZE EQUAL BORE SECTION OF INNER DIAMETER OF ADDITIONAL PRODUCTION STRINGS OF DIRECTIONAL AND HORIZONTAL WELLS | 2020 |
|
RU2747238C1 |
METHOD FOR ISOLATION OF WATERED INTERVALS IN HORIZONTAL SECTION OF WELLBORE | 2016 |
|
RU2611792C1 |
WELL COMPLETION METHOD | 2018 |
|
RU2723815C1 |
METHOD FOR WELL OPERATION AT SIMULTANEOUS SEPARATE PUMPING OF WORKING MEDIUM | 2012 |
|
RU2481464C1 |
METHOD FOR WELL CONSTRUCTION | 2010 |
|
RU2410514C1 |
METHOD FOR SEALING PRODUCTION STRING OF PRODUCTION WELL | 2020 |
|
RU2730157C1 |
METHOD FOR SEALING A PRODUCTION STRING | 2017 |
|
RU2670816C9 |
PLANT FOR SIMULTANEOUS-SEPARATE PUMPING OF WORKING AGENT | 2012 |
|
RU2475631C1 |
Authors
Dates
2018-05-29—Published
2017-05-29—Filed