FIELD: oil and gas industry.
SUBSTANCE: invention relates to oil recovery. In an oil recovery method, comprising developing a reservoir of at least one pair of bore holes – an injection and production bore holes, heating of the productive formation by cyclic injection of the coolant and extraction of oil from the production bore hole, as a heat carrier, a steam produced from the liquid by a submersible centrifugal pump is installed in the injection bore hole is used, the pump being provided with a valve device for cyclical discharging of superheated steam into the bore hole for the purpose of wave action on the productive formation.
EFFECT: increase in energy efficiency of oil production and extraction ratio.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL OR BITUMEN FIELD USING VERTICAL WELLS | 2020 |
|
RU2733862C1 |
DEVELOPMENT METHOD OF DEPOSIT OF HIGH-VISCOSITY OIL OR BITUMEN | 2011 |
|
RU2485304C1 |
PROCEDURE FOR DEVELOPMENT OF DEPOSIT WITH HIGH VISCOUS OIL | 2009 |
|
RU2408782C1 |
METHOD FOR INCREASING OIL RECOVERY OF KEROGEN-COMPRISING SHALE FORMATIONS | 2023 |
|
RU2802297C1 |
BOREHOLE PUMPING UNIT FOR THE EXTRACTION OF BITUMINOUS OIL | 2021 |
|
RU2773651C1 |
METHOD AND DEVICE FOR DEVELOPMENT OF HEAVY OIL OR BITUMEN DEPOSIT BY USING TWO-HEAD HORIZONTAL WELLS | 2009 |
|
RU2410534C1 |
DOWNHOLE PUMP UNIT FOR PRODUCTION OF BITUMINOUS OIL | 2015 |
|
RU2595032C1 |
METHOD AND DEVICE FOR DEVELOPMENT OF HEAVY OIL OR BITUMEN DEPOSIT WITH CONTROL OF WELL PRODUCTION DRAWDOWN | 2009 |
|
RU2398103C1 |
METHOD FOR DEVELOPMENT OF DEPOSIT OF HEAVY OIL OR BITUMEN WITH IMPLEMENTATION OF DOUBLE WELL HEAD HORIZONTAL WELLS | 2010 |
|
RU2431746C1 |
DEVELOPMENT METHOD OF HEAVY OIL OR BITUMEN MINE FIELD | 2011 |
|
RU2455474C1 |
Authors
Dates
2018-06-13—Published
2017-06-20—Filed