FIELD: oil and gas industry.
SUBSTANCE: invention refers to oil industry and can be used during development of heavy oil or bitumen deposit. Development method of heavy oil or bitumen deposit by using two-head horizontal wells involves construction of two-head upper injection and lower production wells with horizontal sections located one above the other. Heat carrier is pumped through injection well with warming-up of the formation by creating the steam chamber and product is extracted through production well. At that, during construction of wells the horizontal section of production well is equipped with filter made in the form of pipe installed inside opened section of casing pipe with a gap which is divided into sections with tight ring inserts. Gaps in sections are filled with water-swellable granules.
EFFECT: increasing operating efficiency of filter owing to controlling the extraction of the well product.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF DEPOSIT OF HEAVY OIL OR BITUMEN WITH CONTROL OVER WITHDRAWAL OF WELL PRODUCTION | 2009 |
|
RU2414593C1 |
METHOD AND DEVICE FOR DEVELOPMENT OF HEAVY OIL OR BITUMEN DEPOSIT USING TWO-HEAD HORIZONTAL WELLS | 2011 |
|
RU2474680C1 |
METHOD AND ARRANGEMENT FOR DEVELOPMENT OF DEPOSIT OF HEAVY OIL OR BITUMEN WITH CONTROL OVER WITHDRAWAL OF WELL PRODUCTION | 2009 |
|
RU2411356C1 |
METHOD FOR DEVELOPMENT OF DEPOSIT OF HEAVY OIL OR BITUMEN WITH IMPLEMENTATION OF DOUBLE WELL HEAD HORIZONTAL WELLS | 2010 |
|
RU2431746C1 |
DEVELOPMENT METHOD OF HEAVY OIL OR BITUMEN MINE FIELD WITH CONTROL OF WELL PRODUCTION EXTRACTION | 2009 |
|
RU2407884C1 |
METHOD FOR DEVELOPMENT OF DEPOSIT OF HEAVY OIL OR BITUMEN WITH CONTROL OVER WITHDRAWAL OF WELL PRODUCTION | 2009 |
|
RU2412343C1 |
DEVELOPMENT METHOD OF HEAVY OIL OR BITUMEN MINE FIELD WITH CONTROL OF WELL PRODUCTION EXTRACTION | 2009 |
|
RU2413068C1 |
PROCEDURE FOR DEVELOPMENT OF HEAVY OIL OR BITUMEN DEPOSIT | 2009 |
|
RU2412344C1 |
METHOD AND DEVICE FOR DEVELOPMENT OF HEAVY OIL OR BITUMEN DEPOSIT WITH CONTROL OF WELL PRODUCTION DRAWDOWN | 2009 |
|
RU2398103C1 |
DEVELOPMENT METHOD OF HEAVY OIL OR BITUMEN MINE FIELD WITH CONTROL OF HEAT CARRIER PUMPED TO WELL | 2009 |
|
RU2418159C1 |
Authors
Dates
2011-01-27—Published
2009-12-14—Filed