FIELD: electronic equipment.
SUBSTANCE: invention relates to electronic devices. Method includes: getting the information about the progress of the management tasks performed by the current user of the intelligent equipment, while the operation tasks are assigned according to the operation functions of the intelligent equipment; selection of the current operation task from the unfinished operation tasks based on the progress information; configuring the rights for manage intelligent equipment in such a way as to prohibit the current user from performing operation functions corresponding to uncompleted operation tasks except the current operation task; and updating the completion progress according to a completion status of the current operation task executed by the current user.
EFFECT: increase the safety of the use of intelligent equipment.
14 cl, 18 dwg
Authors
Dates
2018-07-02—Published
2016-06-03—Filed