FIELD: mining industry.
SUBSTANCE: method includes extraction of resources of mine field by extraction fields, limited in space by surfaces of pyramids sides, vertexes of which do not go beyond lower limit of water-protective massif, allowed when fracturing cracks are absent, and slanting angle of sides of these pyramids is greater than or equal to angle of full displacements of rocks of natural massif, encased in pyramids. Within each pyramid concurrently with extraction of mineral resource artificial carrying block is formed, being in force interaction with rocks surrounding pyramid. Prior to extraction of deposits of mineral resources above future extracted space in water-protective massif a mesh of environment-protective mines is formed with nodes, positioned below pyramid vertexes, limiting extraction fields, and threads - environment-protective mines, directed along sides of these pyramids. Nodes of mesh, mating and/or intersection of environment-protective mines - are preferably positioned below vertexes of pyramids at distance from vertexes no less than height of possible ceiling of crack formations and cave-ins above connection and/or intersection of environment-protective mines.
EFFECT: higher personnel safety.
2 cl, 1 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINING OF WATER-BEARING DEPOSITS OF WATER-SOLUBLE MINERALS | 1999 |
|
RU2163297C1 |
METHOD OF DEVELOPING FLOODED DEPOSITS OF WATER-SOLUBLE MINERALS | 1999 |
|
RU2164601C1 |
METHOD FOR EXTRACTION OF MINERAL RESOURCES DEPOSITS | 2003 |
|
RU2249696C1 |
SALINA DEVELOPMENT METHOD | 2009 |
|
RU2438017C2 |
METHOD FOR UNDERGROUND DEVELOPMENT OF SALT BEDS | 2009 |
|
RU2403388C1 |
METHOD FOR FLOODED WATER-SOLUBLE MINERAL DEPOSIT DEVELOPMENT | 2005 |
|
RU2280164C1 |
METHOD FOR FLOODED WATER-SOLUBLE MINERAL SALT DEPOSIT DEVELOPMENT | 2005 |
|
RU2307935C2 |
METHOD FOR SECONDARY TREATMENT OF SALT BED | 2011 |
|
RU2468206C1 |
METHOD FOR WORKING STARTA OF GENTLY SLOPING AND CLOSE FORMATIONS OF WATER-SOLUBLE MINERALS | 0 |
|
SU1038481A1 |
METHOD OF PREVENTION OF FLOODING OF POTASSIUM MINES AND HAZARDOUS DEFORMATIONS OF EARTH SURFACE AT UNDERGROUND WATER INRUSH INTO MINES | 2007 |
|
RU2341658C1 |
Authors
Dates
2005-06-20—Published
2004-02-09—Filed