FIELD: oil and gas industry.
SUBSTANCE: invention relates to oil and gas industry, in particular to drill fluids, flushing and process fluids used in the completion and total overhaul of oil and gas wells with low layered pressures, with reservoir temperature up to 110 °C, with medium and low permeable reservoirs on hydrogen sulfide-containing fields. Lime drill fluid for total overhaul contains, in wt.%: quicklime 4; hydroxyethyl cellulose 0.5; caustic soda (sodium hydroxide) 0.3; fresh water (technical) or mineralized brine (brine) the rest being.
EFFECT: ensuring the safety of personnel by binding hydrogen sulphide into the well bore, improving the economic efficiency of the well total overhaul by reducing the number of components of the drill fluid without degrading the flow and filtration parameters, as well as the use of cheap non-deficient domestic materials, allowing to preserve the reservoir properties of productive layers.
1 cl, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
LIGHTWEIGHT DRILLING FLUID (OPTIONS) | 2017 |
|
RU2683456C1 |
MUDMAX INHIBITED DRILLING MUD | 2020 |
|
RU2737823C1 |
COMPOSITION FOR PREPARATION OF TECHNOLOGICAL LIQUID FOR COMPLETION AND REPARING OF OIL AND GAS WELLS | 2008 |
|
RU2365612C1 |
HEAT-RESISTANT VISCOELASTIC COMPOSITION FOR FINISHING AND REPAIRING WELLS | 2008 |
|
RU2386665C1 |
METHOD FOR PREPARATION OF BLOCKING FLUID FOR KILLING WELLS | 2022 |
|
RU2781988C1 |
FLOWING WELL KILLING METHOD | 2004 |
|
RU2275497C2 |
HYDROGEL DRILLING MUD | 1997 |
|
RU2135542C1 |
FLUID FOR WELL KILLING | 2011 |
|
RU2460753C1 |
METHOD FOR PREPARATION OF POLYMERIC DRILLING FLUID | 0 |
|
SU1724674A1 |
BLOCKING COMPOSITE FOR ISOLATION OF LOSS-CIRCULATION ZONES DURING WELL DRILLING AND WORKOVER OPERATION | 2012 |
|
RU2487909C1 |
Authors
Dates
2019-03-28—Published
2018-05-03—Filed