METHOD FOR DEVELOPMENT OF SUPER-VISCOUS OIL AND/OR BITUMEN DEPOSIT IN COMPACTED AND CLOGGED RESERVOIRS (VERSIONS) Russian patent published in 2019 - IPC E21B43/27 E21B43/24 E21B7/04 E21B49/00 C09K8/72 

Abstract RU 2686768 C1

FIELD: oil and gas industry.

SUBSTANCE: group of inventions relates to oil industry. Method for development of super-viscous oil and / or bitumen deposit in compacted and clogged collectors involves use of a pair of horizontal injection and production wells, horizontal sections of which are arranged parallel to each other in vertical plane of treated formation, lowering of tubing string or coiled tubing of a coiled tubing combined installation, which allow simultaneous pumping of heat carrier and product extraction, pumping of heat carrier, heating of treated formation with creation of steam chamber, extraction of products through production well and control of process parameters of formation. Prior to lowering of tubing string or coiled tubing intake capacity of horizontal injection well and coefficients of clayiness and carbonate in bed of treated formation are determined. Range is selected with injectivity from 0.1 to 10 m3/day per 100 m of horizontal well barrel and clay factor from 0.05 to 0.95 unit fraction. Length and volume of the selected interval are determined. At length of allocated interval, equal to length of horizontal part of injection well, tubing string or coiled tubing is lowered above 3–5 m from bottom of horizontal injection well, acid composition is pumped through the tubing string or coiled tubing into the horizontal injection well. If the carbonate coefficient is from 0 to 0.049 unit fraction, acid composition contains, wt. fraction: 24 % inhibited hydrochloric acid 0.33–0.50; 70 % hydrofluoric acid 0.04–0.07; water – balance. At value of carbonate coefficient from 0.05 to 0.95 unit fraction, acid composition contains, wt. fraction: 24 % inhibited hydrochloric acid 0.33–0.50; water – balance. Volume of acid composition is determined depending on volume of allocated interval. Acid composition is pressurized with 5 % by weight aqueous solution of potassium chloride in volume of tubing string or coiled tubing. Column of process tubing string or coiled tubing is lifted to vertical part of well, horizontal injection well is closed for reaction till 4–5 h. Tubing string or coiled tubing is lowered above 3–5 m from the bottomhole and horizontal injection well is washed with aerated liquid in volume of not less than pumped acid composition to neutral pH value of the carried fluid pH. Then heat carrier is pumped and product is withdrawn. If the length of the allocated interval is less than the length of the horizontal part of the injection well, the tubing string or coiled tubing is installed in the middle of the selected interval; the above operations are performed starting from pumping of the acid composition before its injection. Then, the tubing string or coiled tubing is moved to the middle of the next selected interval and the above operations are repeated. Treatment is started with the selected interval closest to the working face.

EFFECT: increased coverage of the treated formation by thermal action, reduced time for heating of the treated formation, reduced power consumption for implementation of the method, increased coefficient of oil recovery.

2 cl, 4 dwg, 1 tbl, 2 ex

Similar patents RU2686768C1

Title Year Author Number
METHOD FOR PROCESSING BOTTOMHOLE FORMATION ZONE 2014
  • Sergeev Vitalij Vjacheslavovich
RU2583104C1
METHOD FOR WELL BOTTOM ZONE TREATMENT 2004
  • Apasov Timergalej Kabirovich
  • Kanzafarov Fidrat Jakh'Jaevich
  • Leonov Vasilij Aleksandrovich
  • Apasov Renat Timergaleevich
RU2270913C2
ULTRA VISCOUS OIL HETEROGENEOUS RESERVOIR DEVELOPMENT METHOD 2018
  • Amerkhanov Marat Inkilapovich
  • Akhmadullin Robert Rafaelovich
  • Akhmetzyanov Fanil Muktasimovich
  • Akhmetshin Nail Munirovich
  • Beregovoj Anton Nikolaevich
RU2678738C1
METHOD OF OIL POOL DEVELOPMENT 2014
  • Khisamov Rais Salikhovich
  • Gumarov Nafis Faritovich
  • Ganiev Bulat Galievich
  • Khusainov Ruslan Fargatovich
  • Garifullin Rustem Maratovich
  • Tuktarov Tagir Asgatovich
  • Mannapov Marat Ilgizarovich
RU2540713C1
METHOD FOR DEVELOPING HETEROGENOUS ULTRAVISCOUS OIL RESERVOIR 2021
  • Amerkhanov Marat Inkilapovich
  • Asliamov Niiaz Anisovich
  • Garifullin Marat Zufarovich
RU2760747C1
METHOD TO DEVELOP OIL POOL 2014
  • Khisamov Rais Salikhovich
  • Gumarov Nafis Faritovich
  • Ganiev Bulat Galievich
  • Khusainov Ruslan Fargatovich
RU2551571C1
OIL DEPOSIT DEVELOPMENT METHOD 2023
  • Andaeva Ekaterina Alekseevna
  • Gizdatullin Rustam Fanuzovich
RU2814676C1
METHOD FOR DEVELOPING HETEROGENOUS ULTRAVISCOUS OIL RESERVOIR 2021
  • Amerkhanov Marat Inkilapovich
  • Asliamov Niiaz Anisovich
  • Garifullin Marat Zufarovich
RU2760746C1
METHOD FOR HYDRAULIC FRACTURING OF A FORMATION ON A CARBONATE DEPOSIT OF HIGH-VISCOSITY OIL 2022
  • Andaeva Ekaterina Alekseevna
  • Gizdatullin Rustam Fanuzovich
RU2784709C1
DEVELOPMENT OF OIL DEPOSIT BY MULTIHOLE HORIZONTAL WELLS 2013
  • Khisamov Rais Salikhovich
  • Akhmetgareev Vadim Valer'Evich
  • Volkov Igor' Vladimirovich
  • Gazizov Il'Gam Garifzjanovich
  • Emel'Janov Vitalij Vladimirovich
RU2536891C1

RU 2 686 768 C1

Authors

Amerkhanov Marat Inkilapovich

Beregovoj Anton Nikolaevich

Vasilev Eduard Petrovich

Knyazeva Natalya Alekseevna

Razumov Andrej Rafailovich

Dates

2019-04-30Published

2018-08-01Filed