FIELD: shipbuilding.
SUBSTANCE: system includes lifting lugs installed on the submarine, docking units in the form of pads for guide conductors installed at an equal distance from the longitudinal axial line of lifting lugs, lifting devices, each of which contains lugs interconnected by an axis, can hook with a latch spring, connected by an axis to the lower lug, ship-lifting clamps attached to the upper lug, a device for cocking the can hook and locking it in the cocked position, made in the form of a magnet with a control knob mounted on the lower lug, and interacting with it a lock with reinforcement mounted on the can hook.
EFFECT: simplifies the technology of ostropky.
1 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
SYSTEM FOR LIFTING OF SUNKEN SUBMARINES | 2018 |
|
RU2707472C1 |
SYSTEM FOR SUNK SUBMARINE SALVAGING | 2011 |
|
RU2517387C2 |
DEVICE FOR LIFTING OF SUNKEN SUBMARINES | 2018 |
|
RU2721816C2 |
SALVAGE SYSTEM | 2011 |
|
RU2518683C2 |
CAPTURING ROD DEVICE OF SUBMARINE | 2019 |
|
RU2733632C2 |
GRIPPER OF SUBMARINE ROD DEVICE | 2020 |
|
RU2748088C1 |
HOISTING DEVICE FOR SUNKEN SUMBARINE VESSELS | 2006 |
|
RU2330778C2 |
SOFT LIFTING PONTOON | 2014 |
|
RU2602444C2 |
SHIP-RAISING SIMULATOR | 2021 |
|
RU2777286C1 |
DISMOUNTABLE LIFTING PONTOON | 2011 |
|
RU2483969C1 |
Authors
Dates
2019-05-23—Published
2017-09-11—Filed