FIELD: soil or rock drilling; mining.
SUBSTANCE: invention relates to a drill-hole tunneling device for constructing a drilling hole from an initial point to a final point in a soil along a given drilling line by moving a drilling tunnel-tunneling device for tunnel construction or for laying a pipeline in soil, having a drilling tool for separating soil, at least one feeder pipeline for supply of drilling fluid to drilling tool, at least, one located on the back side of the drilling tool, to accommodate the separated form of drilling fines, wherein the drilling tool region and at least one portion are substantially filled with drilling fluid, and in the area of the drilling tool and within at least one portion, drilling fluid is provided with pressure corresponding substantially to pressure in the soil on the working face chest, at least one pump for removal of drilling fluid mixed with drilling fluid from the section, at least one discharge pipeline for removal of drilling fluid mixed with drilling fine material from the drilling hole, which is connected to pressure side of at least one pump, and wherein at least one pump is connected to at least one section through at least one suction pipeline. At that, it is provided that the pump is a jet pump which is connected to the displacement fluid pipeline, through which the displacement liquid is supplied to the jet pump, that at least one pump is located outside of at least one section, and that at least in one suction pipeline at least one shut-off valve is provided, by means of which the suction pipeline is shut off.
EFFECT: technical result consists in creation of tunnel tunneling device and system, by means of which it is possible to maintain constant pressure of drilling fluid on bottomhole.
10 cl, 8 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR THE DEVELOPMENT OF MINERAL DEPOSITS BY AN UNDERGROUND METHOD USING TUNNEL-BORING MECHANIZED COMPLEXES | 2022 |
|
RU2801989C1 |
CUTTER ASSEMBLY FOR TUNNEL BORING MACHINE WITH PRESSURE COMPENSATION | 2012 |
|
RU2580861C2 |
TUBULAR DRILL ROD, AS WELL AS SYSTEM AND METHOD OF PIPELINE LAYING | 2017 |
|
RU2719885C1 |
HIGH-PRECISION SENSOR EQUIPMENT FOR SETTING MECHANICAL LOAD OF EXTRACTION TOOL OF DRILLING TUNNEL BORING MACHINE | 2015 |
|
RU2688997C2 |
TUNNELING COMPLEX | 1992 |
|
RU2043503C1 |
METHOD FOR CONSTRUCTING A TUNNEL AND DEVICE FOR REALIZATION OF SAID METHOD | 2004 |
|
RU2244830C1 |
DRILLING DEVICE AND DRILLING METHOD | 2002 |
|
RU2240418C2 |
DRILLING TOOL FOR WELL DRILLING AND FLUSHING THEREOF, WELL DRILLING METHOD AND DRILLING RIG | 2004 |
|
RU2282012C2 |
FOAM GENERATOR FOR EARTH PRESSURE SHIELD TUNNEL PROPULSION MACHINE AND METHOD FOR CONDITIONING REMOVED SOIL MATERIAL AS SUPPORT MEDIUM FOR EARTH PRESSURE SHIELD | 2015 |
|
RU2681713C2 |
METHOD AND DEVICE FOR TRENCHLESS LAYING OF PIPELINES | 2014 |
|
RU2645685C2 |
Authors
Dates
2019-05-23—Published
2017-01-27—Filed