FIELD: construction.
SUBSTANCE: invention relates to road construction, specifically to structures of prefabricated road surfaces. System of slabs of prefabricated road pavement for construction of roads includes serially arranged reinforced concrete prestressed plates of rectangular shape, tightened into packages with strained steel ropes in shell, arranged in channels in body of plates, along the perimeter of each plate there is a shaped groove and in joints between the plates there are elastic elements with a shaped ledge, which are made continuous for the whole length of joint of plates. Each elastic element contains metal fittings in the central part. End face of resilient element laid either between plates of one package, or between plates of two adjacent packages, has figured recess, mating for longitudinal projection. At parallel stacking of plates, the end face of resilient element has figured cavity mating for lengthwise projection.
EFFECT: disclosed is a method of laying a system of slabs of prefabricated road surface.
9 cl, 14 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BUILDING PREFABRICATED ROAD AND AERODROME PAVEMENTS FROM PRESTRESSED REINFORCED CONCRETE SLABS | 2021 |
|
RU2767640C1 |
BUILDING METHOD AND PREFABRICATED PAVEMENT STRUCTURE | 2007 |
|
RU2379406C2 |
REINFORCED CONCRETE PLATE OF ASSEMBLED ROAD CARPET | 2007 |
|
RU2371536C2 |
ROAD PAVEMENT FOR MOTOR ROADS AND AERODROME PAVEMENTS | 2011 |
|
RU2473728C1 |
METHOD FOR INSTALLATION OF PERMANENT WAY | 2007 |
|
RU2352705C1 |
PRESTRESSED REINFORCED CONCRETE SLAB FOR RAILWAY ROADS | 2007 |
|
RU2373317C2 |
METHOD OF ROAD CONSTRUCTION ON SOFT AND FROZEN GROUNDS AND ASSEMBLED COAT FOR ITS REALISATION | 2008 |
|
RU2371537C2 |
RAILWAY RAIL LENGTH (VERSIONS) | 2007 |
|
RU2381317C2 |
TRACK UPPER STRUCTURE DESIGN | 2007 |
|
RU2352706C1 |
CONSTRUCTION METHOD AND DESIGN OF OVERPASSES AND BRIDGES UNDER CONDITIONS OF PERMAFROST | 2012 |
|
RU2513574C2 |
Authors
Dates
2019-06-26—Published
2017-10-02—Filed