METHOD FOR CONSTRUCTION OF MULTI-BARREL WELL AND GUIDE DEVICE FOR INSTALLATION OF CASING STRING IN ITS ADDITIONAL SHAFT Russian patent published in 2019 - IPC E21B7/08 

Abstract RU 2695911 C1

FIELD: oil and gas industry.

SUBSTANCE: group of inventions relates to oil and gas industry and can be used for drilling and fastening additional wellbores of multi-barrel well from previously drilled cased wells. Method of multi-barrel well construction includes opening of window in casing of primary borehole and drilling of the new additional borehole to the design depth using the extracted wedge-deflector, lowering the shank with casing pipes to the mouth of the new additional borehole with further sealing of the additional borehole, treatment of upper part of shank to obtain access to lower part of primary shaft, extraction of wedge-deflector, wherein inner diameter of casing of primary shaft before lowering wedge-deflector in area of window and above is expanded, wedge-diverter with anchor is removed until shank is lowered, which is made in the form of longitudinal corrugated pipe with increased perimeter in expansion zone of inner diameter of casing of the primary shaft. Shank lowered on the pipe string is placed in the additional shaft by means of a guide shoe attached from below. Corrugated sections of liner are straightened with excess pressure with fixation by rolling in additional barrel. Upper part of the shank is processed in two stages, at the first of which the guide window is cut in the shank to create communication with the primary shaft, on the second one – expansion of the upper part of the shank till it is pressed to expansion flush to the walls of the primary shaft. Guide shoe is inserted into the lower part of the shank with possibility of tight longitudinal movement. Shank before the lowering is equipped from the inside with the possibility of joint rotation by the hollow process string communicated by the side channels with the tight cavity of the shank and connected from below to the guide shoe, and from above – from the pipe string. Below lateral channels in the process string a saddle is placed under a drop-off element from the wellhead, after discharge of which into the well, the corrugated sections of the shank are redressed with excessive pressure with subsequent disconnection and removal of the guide shoe onto the surface.

EFFECT: higher reliability of the method and device, increased efficiency of the well and simplified process of isolation of the zones of complications, reduced accident rate and construction time of multi-barrel wells.

2 cl, 4 dwg

Similar patents RU2695911C1

Title Year Author Number
METHOD FOR CONSTRUCTION OF ADDITIONAL WELL BORE OF MULTI-LATERAL WELL AND DEVICE FOR ITS IMPLEMENTATION 2016
  • Akhmadishin Farit Foatovich
  • Mukhametshin Almaz Adgamovich
  • Nasyrov Azat Leonardovich
RU2636608C1
METHOD OF CONSTRUCTING BRANCHED WELL AND DEVICE FOR ITS IMPLEMENTATION 2016
  • Akhmadishin Farit Foatovich
  • Mukhametshin Almaz Adgamovich
  • Nasyrov Azat Leonardovich
  • Ilalov Rustam Khisamovich
RU2630332C1
METHOD OF CONSTRUCTING ADDITIONAL WELLBORE AND DEVICE FOR ITS IMPLEMENTATION 2016
  • Akhmadishin Farit Foatovich
  • Mukhametshin Almaz Adgamovich
  • Nasyrov Azat Leonardovich
  • Osnos Vladimir Borisovich
RU2635410C1
METHOD FOR RECONSTRUCTION OF AN INACTIVE WELL 2022
  • Galikeev Ilgizar Abuzarovich
  • Kolesova Svetlana Borisovna
  • Shumikhin Andrei Aleksandrovich
  • Mirsaetov Oleg Marsimovich
RU2795655C1
METHOD OF CONSTRUCTION OF MULTI-BOTTOM WELL AND MOUNTING DEVICE THEREFOR 2018
  • Mukhametshin Almaz Adgamovich
  • Akhmadishin Farit Foatovich
  • Nasyrov Azat Leonardovich
RU2674355C1
DEVICE TO DRILL ADDITIONAL BORE FROM WELL 2006
  • Zajnullin Al'Bert Gabidullovich
  • Polenok Pavel Vladimirovich
  • Abdrakhmanov Gabdrashit Sultanovich
  • Galikeev Il'Gizar Abuzarovich
  • Moskovkin Vladimir Il'Ich
  • Garifullin Ramil' Al'Fredovich
  • Malyshev Sergej Gennadievich
  • Mukhametshin Almaz Adgamovich
RU2307227C1
METHOD OF MULTILATERAL WELL CONSTRUCTION 2016
  • Bakirov Daniyar Lyabipovich
  • Fattakhov Marsel Masalimovich
RU2650161C2
SYSTEM AND METHOD FOR CONSTRUCTION AND COMPLETION OF MULTI-DOWNHOLE WELLS 2019
  • Kashlev Aleksandr Sergeevich
  • Nizamov Dinar Ilgizovich
  • Fedotov Andrej Gennadevich
RU2753417C2
DEFLECTION DEVICE 2013
  • Zajnullin Al'Bert Gabidullovich
  • Polenok Pavel Vladimirovich
  • Malyshev Sergej Gennad'Evich
  • Petlin Jurij Ivanovich
  • Moskovkin Vladimir Il'Ich
RU2539494C2
METHOD FOR SELECTIVE ACCESS TO BARRELS OF MULTI-BARREL WELL AND EQUIPMENT FOR IMPLEMENTATION OF METHOD 2020
  • Khaerlanamov Rafail Rifovich
  • Abdurakhmanov Marat Temirkhanovich
  • Dautov Marat Noilevich
RU2740283C1

RU 2 695 911 C1

Authors

Mukhametshin Almaz Adgamovich

Akhmadishin Farit Foatovich

Nasyrov Azat Leonardovich

Dates

2019-07-29Published

2018-10-09Filed