FIELD: manufacturing technology.
SUBSTANCE: process plant (1) for liquefied gas production comprises heat exchanger (2), first and second compressors (4, 5), first suction pipeline (25) connected only with possibility of transfer of fluid medium with first compressor (4) and connected to heat exchanger (2), second suction pipeline (26), connected only with possibility of transfer of fluid medium to second compressor (5) and connected to heat exchanger (2), first receiving tank (6) located between first compressor (4) and first section (8) of first suction pipeline (25), and second receiving container (7) located between second compressor (5) and first section (9) of second suction pipeline (26). First suction pipeline (25) is not connected with possibility of transfer of fluid medium to the second suction pipeline (26). Between first compressor (4) and the first receiving container (6) second section (10) of the first suction pipeline (25) is located. Between second compressor (5) and the second receiving vessel (7) second section (11) of the second suction pipeline (26) is located. Second section (10) of the first suction pipeline (25) has the same length as second section (11) of the second suction pipeline (26).
EFFECT: prevention of pressure losses.
12 cl, 4 dwg
Title |
Year |
Author |
Number |
THERMODYNAMIC SYSTEM COMPRISING A FLUID AND METHOD FOR REDUCING PRESSURE THEREIN |
2019 |
- Gallinelli, Lorentso
- Pelella, Marko
- Baldantsini, Fabio
- Baldassare, Leonardo
|
RU2753266C1 |
IMPROVED SYSTEM OF FLASH EVAPORATION OF METHANE FOR DECOMPRESSION OF NATURAL GAS |
2003 |
- Khan Pol R.
- Jao Dzhejm
- Li Zhun-Tszvun
- Bodat Ned P.
- Iton Ehntoni P.
- Ritchi Fillip D.
|
RU2330223C2 |
METHOD AND SYSTEM FOR PRODUCING PRESSURISED AND AT LEAST PARTIALLY CONDENSED MIXTURE OF HYDROCARBONS |
2015 |
- Imamkhan, Brian Reza Shaied Shehdjiet
|
RU2684621C2 |
METHOD AND DEVICE FOR COOLING FLUID MEDIUM IN LIQUEFYING NATURAL GAS |
1994 |
|
RU2121637C1 |
METHOD AND SYSTEM FOR CONTROL OF REFRIGERANT COMPOSITION IN CASE OF LEAKS FROM THE GAS PIPE IN THE HEAT EXCHANGER |
2020 |
- Kumar, Paramasivam, Senthil
|
RU2805608C2 |
POWER BALANCING IN LIQUEFICATION SPLIT SYSTEM WITH MIXED REFRIGERANT |
2019 |
- Ott, Kristofer Majkl
- Berg, Dzhonatan Dzhejms
- Ott Vejst, Annemari
- Verman, Dzhozef Dzherard
|
RU2766164C2 |
DEVICE FOR LIQUEFACTION OF HYDROCARBON FEED STREAM (VERSIONS) |
2018 |
- Krishnamurthy, Gowri
- Roberts, Mark Julian
- Brostow, Adam, Adrian
|
RU2724091C2 |
DESUPERHEATER SYSTEM, COMPRESSION SYSTEM USING SUCH SYSTEM, AND METHOD OF PRODUCING COMPRESSED AND AT LEAST PARTIALLY CONDENSED MIXTURE OF HYDROCARBONS |
2015 |
- Imamkhan, Brian Reza Shaied Shehdjiet
- Kessels, Bas
|
RU2692855C1 |
METHOD AND SYSTEM FOR COOLING COMPOSITE REFRIGERANT |
1997 |
|
RU2175099C2 |
LIQUEFACTION METHOD OF NATURAL GAS PUMPED FROM MAIN GAS LINE (VERSIONS) |
2009 |
- Antipov Boris Nikolaevich
- Dubinskij Viktor Grigor'Evich
- Egorov Ivan Fedorovich
- Ponomarev Vladimir Mikhajlovich
- Vjatin Aleksandr Stepanovich
- Kudrjavtsev Dmitrij Alekseevich
|
RU2412410C1 |